Napoleon Peaking Station
Natural gas power plant in Henry County, Ohio. 49.5 MW of nameplate capacity across 2 generators, operated by American Mun Power-Ohio, Inc.
Also known as EIA plant 55264
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 49.5 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- June 2000First generator online
- Operator
- American Mun Power-Ohio, IncEIA operator ID 40577
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Henry County, OH41.4079, −84.1095
- EIA plant ID
- 55264EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Napoleon Peaking Station produces
Free · EIA-923Net generation, 2025
2.57 GWh
2,570 MWh, final
Capacity factor, 2025
0.6%
2024: 0.6%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
1.4–3.4
GWh a year. Low 2022, high 2018
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | 6,721 | Not reported | 12 of 12 |
| 2002 | 2,142 | Not reported | 12 of 12 |
| 2003 | 205 | Not reported | 12 of 12 |
| 2004 | 0 | Not reported | 12 of 12 |
| 2005 | 1,501 | Not reported | 12 of 12 |
| 2006 | 260 | Not reported | 12 of 12 |
| 2007 | 622 | Not reported | 12 of 12 |
| 2008 | 258 | Not reported | 12 of 12 |
| 2009 | 451 | Not reported | 12 of 12 |
| 2010 | 749 | 0.2% | 12 of 12 |
| 2011 | 2,123 | 0.5% | 12 of 12 |
| 2012 | 1,949 | 0.4% | 12 of 12 |
| 2013 | 2,065 | 0.5% | 12 of 12 |
| 2014 | 892 | 0.2% | 12 of 12 |
| 2015 | 1,514 | 0.3% | 12 of 12 |
| 2016 | 3,077 | 0.7% | 12 of 12 |
| 2017 | 2,145 | 0.5% | 12 of 12 |
| 2018 | 3,389 | 0.8% | 12 of 12 |
| 2019 | 2,197 | 0.5% | 12 of 12 |
| 2020 | 2,423 | 0.6% | 12 of 12 |
| 2021 | 2,980 | 0.7% | 12 of 12 |
| 2022 | 1,430 | 0.3% | 12 of 12 |
| 2023 | 1,968 | 0.5% | 12 of 12 |
| 2024 | 2,800 | 0.6% | 12 of 12 |
| 2025 | 2,570 | 0.6% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDCO₂, 2025
1,266
US short tons. 2024: 1,310
SO₂, 2025
0
US short tons
NOx, 2025
2
US short tons
CO₂ per MWh, calculated
0.49 t
About 985 lb per MWh
1 of 1 EPA units reported CO₂ in 2025 (CT1), matched to EIA plant 55264 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CT1 | Natural Gas Fired Combustion Turbine | 33.0 | June 2000 |
| CT2 | Natural Gas Fired Combustion Turbine | 16.5 | June 2000 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists American Mun Power-Ohio, Inc as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Napoleon Peaking Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Napoleon Peaking Station
More plants operated by American Mun Power-Ohio, Inc
Questions about Napoleon Peaking Station
How much power does Napoleon Peaking Station produce?
Napoleon Peaking Station reported 2,570 MWh (2.57 GWh) of net generation in 2025, a 0.6% capacity factor on 49.5 MW of nameplate capacity.
Where is Napoleon Peaking Station?
Napoleon Peaking Station is in Henry County, Ohio, at 41.4079, −84.1095. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Napoleon Peaking Station?
EIA-860M for August 2026 lists American Mun Power-Ohio, Inc as the operator (EIA operator ID 40577). The operator is not always the owner.
When did Napoleon Peaking Station start operating?
Its first generator began operating in June 2000, according to EIA-860M.
Does InfraMap have power prices for Napoleon Peaking Station?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Napoleon Peaking Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page