SolarOperatingPJM

AMP Napoleon Solar Facility

Solar power plant in Henry County, Ohio. 3.5 MW of nameplate capacity across 1 generator, operated by American Mun Power-Ohio, Inc.

Also known as EIA plant 58082

Analyst: free account, 1 question a day.

Richland (OH)StrykerAuglaize HydroAMP Napoleon Solar Facility10 km
Open in the map
6 plants within 31 km, from EIA coordinates.

Key facts

Capacity
3.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2012First generator online
Operator
American Mun Power-Ohio, IncEIA operator ID 40577
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Henry County, OH41.4067, −84.1108
EIA plant ID
58082EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power AMP Napoleon Solar Facility produces

Free · EIA-923

Net generation, 2025

4.21 GWh

4,214 MWh, final

Capacity factor, 2025

13.7%

2024: 15.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

3.7–5.1

GWh a year. Low 2018, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012567Not reported4 of 12
20135,26217.2%12 of 12
20145,14716.8%12 of 12
20155,11116.7%12 of 12
20164,88815.9%12 of 12
20174,90516.0%12 of 12
20183,73612.2%12 of 12
20194,40914.4%12 of 12
20204,45814.5%12 of 12
20214,93716.1%12 of 12
20224,67615.3%12 of 12
20234,55514.9%12 of 12
20244,61915.0%12 of 12
20254,21413.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
NSF1Solar Photovoltaic3.5September 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists American Mun Power-Ohio, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query AMP Napoleon Solar Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near AMP Napoleon Solar Facility

More plants operated by American Mun Power-Ohio, Inc

Questions about AMP Napoleon Solar Facility

How much power does AMP Napoleon Solar Facility produce?

AMP Napoleon Solar Facility reported 4,214 MWh (4.21 GWh) of net generation in 2025, a 13.7% capacity factor on 3.5 MW of nameplate capacity.

Where is AMP Napoleon Solar Facility?

AMP Napoleon Solar Facility is in Henry County, Ohio, at 41.4067, −84.1108. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates AMP Napoleon Solar Facility?

EIA-860M for August 2026 lists American Mun Power-Ohio, Inc as the operator (EIA operator ID 40577). The operator is not always the owner.

When did AMP Napoleon Solar Facility start operating?

Its first generator began operating in September 2012, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page