Tulare CSG LLC
Solar power plant in Tulare County, California. 3 MW of nameplate capacity across 1 generator, operated by Dimension Energy LLC.
Also known as EIA plant 66679
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 3 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- October 2024First generator online
- Operator
- Dimension Energy LLCEIA operator ID 65677
- Grid
- CAISOBalancing authority CISO
- Price nodes
- 1 CAISO nodeResource nodes with prices
- Location
- Tulare County, CA35.9874, −119.4804
- EIA plant ID
- 66679EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Tulare CSG produces
Free · EIA-923Net generation, 2025
6.42 GWh
6,419 MWh, final
Capacity factor, 2025
24.4%
2024: Not reported
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2024 to 2025
0.4–6.4
GWh a year. Low 2024, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | 375 | Not reported | 12 of 12 |
| 2025 | 6,419 | 24.4% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · CAISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| TULAR | Solar Photovoltaic | 3.0 | October 2024 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Dimension Energy LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Tulare CSG LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Tulare CSG
More plants operated by Dimension Energy LLC
Questions about Tulare CSG
How much power does Tulare CSG LLC produce?
Tulare CSG LLC reported 6,419 MWh (6.42 GWh) of net generation in 2025, a 24.4% capacity factor on 3 MW of nameplate capacity.
Where is Tulare CSG LLC?
Tulare CSG LLC is in Tulare County, California, at 35.9874, −119.4804. It is in the California Independent System Operator balancing area (CISO).
Who operates Tulare CSG LLC?
EIA-860M for August 2026 lists Dimension Energy LLC as the operator (EIA operator ID 65677). The operator is not always the owner.
When did Tulare CSG LLC start operating?
Its first generator began operating in October 2024, according to EIA-860M.
Does InfraMap have power prices for Tulare CSG LLC?
Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Tulare CSG LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page