Cavalier Solar A2
Solar power plant in Isle of Wight County, Virginia. 84.4 MW of nameplate capacity across 1 generator, operated by AES Clean Energy.
Also known as EIA plant 67421
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 84.4 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2024First generator online
- Operator
- AES Clean EnergyEIA operator ID 64904
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Isle of Wight County, VA37.0180, −76.7358
- EIA plant ID
- 67421EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Cavalier Solar A2 produces
Free · EIA-923Net generation, 2025
159 GWh
158,795 MWh, final
Capacity factor, 2025
21.5%
2024: Not reported
January to July 2026
103 GWh
Provisional
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | 7,601 | Not reported | 1 of 12 |
| 2025 | 158,795 | 21.5% | 12 of 12 |
| 2026 (provisional, partial year) | 103,187 | 24.0% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CAVA2 | Solar Photovoltaic | 84.4 | December 2024 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists AES Clean Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Cavalier Solar A2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Cavalier Solar A2
More plants operated by AES Clean Energy
Questions about Cavalier Solar A2
How much power does Cavalier Solar A2 produce?
Cavalier Solar A2 reported 158,795 MWh (159 GWh) of net generation in 2025, a 21.5% capacity factor on 84.4 MW of nameplate capacity. From January to July 2026 it reported 103 GWh, which is provisional.
Where is Cavalier Solar A2?
Cavalier Solar A2 is in Isle of Wight County, Virginia, at 37.0180, −76.7358. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Cavalier Solar A2?
EIA-860M for August 2026 lists AES Clean Energy as the operator (EIA operator ID 64904). The operator is not always the owner.
When did Cavalier Solar A2 start operating?
Its first generator began operating in December 2024, according to EIA-860M.
Does InfraMap have power prices for Cavalier Solar A2?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Cavalier Solar A2, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page