Natural gasOilOperatingPJM

Gravel Neck

Natural gas power plant in Surry County, Virginia. 407.7 MW of nameplate capacity across 6 generators, operated by Virginia Electric & Power Co.

Also known as Gravel Neck Power Plant · EIA plant 7032

Analyst: free account, 1 question a day.

SurryCavalier SolarCavalier Solar A2Colonial Trail WestSpring Grove IGravel Neck10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
407.7 MWNatural gas 367.6 · Oil 40.1
Generators
6 operatingEIA-860M, August 2026
Operating since
August 1970First generator online
Operator
Virginia Electric & Power CoEIA operator ID 19876
Grid
PJMBalancing authority PJM
Price nodes
4 PJM nodesResource nodes with prices
Location
Surry County, VA37.1575, −76.6911
EIA plant ID
7032EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gravel Neck produces

Free · EIA-923

Net generation, 2025

120 GWh

119,980 MWh, final

Capacity factor, 2025

3.4%

2024: 3.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

25.3–147.5

GWh a year. Low 2021, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200040,383Not reported12 of 12
200137,822Not reported12 of 12
200229,448Not reported12 of 12
200375,223Not reported12 of 12
200413,557Not reported12 of 12
2005122,308Not reported12 of 12
200661,381Not reported12 of 12
2007101,658Not reported12 of 12
2008229Not reported1 of 12
200967,716Not reported12 of 12
2010138,3083.9%12 of 12
201165,5801.8%12 of 12
201269,4241.9%12 of 12
201386,8342.4%12 of 12
201452,7651.5%12 of 12
201591,2682.6%12 of 12
2016138,2463.9%12 of 12
201762,3001.7%12 of 12
201891,3902.6%12 of 12
201978,8192.2%12 of 12
2020147,4914.1%12 of 12
202125,3230.7%12 of 12
202232,6160.9%12 of 12
202389,2932.5%12 of 12
2024115,4213.2%12 of 12
2025119,9803.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

146,525

US short tons. 2024: 95,077

SO₂, 2025

69

US short tons

NOx, 2025

276

US short tons

CO₂ per MWh, calculated

1.22 t

About 2,442 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (3, 4, 5, 6), matched to EIA plant 7032 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids16.3August 1970
2Petroleum Liquids23.8December 1970
3Natural Gas Fired Combustion Turbine91.9October 1989
4Natural Gas Fired Combustion Turbine91.9July 1989
5Natural Gas Fired Combustion Turbine91.9July 1989
6Natural Gas Fired Combustion Turbine91.9November 1989

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Virginia Electric & Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gravel Neck and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gravel Neck

More plants operated by Virginia Electric & Power Co

Questions about Gravel Neck

How much power does Gravel Neck produce?

Gravel Neck reported 119,980 MWh (120 GWh) of net generation in 2025, a 3.4% capacity factor on 407.7 MW of nameplate capacity.

Where is Gravel Neck?

Gravel Neck is in Surry County, Virginia, at 37.1575, −76.6911. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Gravel Neck?

EIA-860M for August 2026 lists Virginia Electric & Power Co as the operator (EIA operator ID 19876). The operator is not always the owner.

When did Gravel Neck start operating?

Its first generator began operating in August 1970, according to EIA-860M.

Does InfraMap have power prices for Gravel Neck?

Yes. InfraMap has PJM day-ahead and real-time prices at 4 price nodes linked to Gravel Neck, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page