SolarOperatingPJM

Colonial Trail West

Solar power plant in Surry County, Virginia. 142.4 MW of nameplate capacity across 1 generator, operated by Dominion Energy Inc..

Also known as Colonial Trail West Solar Farm · EIA plant 61985

Analyst: free account, 1 question a day.

Spring Grove Solar 2Spring Grove ISurryCavalier SolarCavalier Solar A2Colonial Trail West10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
142.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2019First generator online
Operator
Dominion Energy Inc.EIA operator ID 5248
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Surry County, VA37.1389, −76.9022
EIA plant ID
61985EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Colonial Trail West produces

Free · EIA-923

Net generation, 2025

283 GWh

283,404 MWh, final

Capacity factor, 2025

22.7%

2024: 22.5%

January to July 2026

193 GWh

Provisional

Range, 2020 to 2025

260.2–301.4

GWh a year. Low 2023, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
20196,451Not reported1 of 12
2020301,37124.1%12 of 12
2021271,23621.7%12 of 12
2022275,02922.0%12 of 12
2023260,16320.9%12 of 12
2024281,78122.5%12 of 12
2025283,40422.7%12 of 12
2026 (provisional, partial year)193,23526.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTWSSolar Photovoltaic142.4December 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Dominion Energy Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Colonial Trail West and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Colonial Trail West

More plants operated by Dominion Energy Inc.

Questions about Colonial Trail West

How much power does Colonial Trail West produce?

Colonial Trail West reported 283,404 MWh (283 GWh) of net generation in 2025, a 22.7% capacity factor on 142.4 MW of nameplate capacity. From January to July 2026 it reported 193 GWh, which is provisional.

Where is Colonial Trail West?

Colonial Trail West is in Surry County, Virginia, at 37.1389, −76.9022. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Colonial Trail West?

EIA-860M for August 2026 lists Dominion Energy Inc. as the operator (EIA operator ID 5248). The operator is not always the owner.

When did Colonial Trail West start operating?

Its first generator began operating in December 2019, according to EIA-860M.

Does InfraMap have power prices for Colonial Trail West?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Colonial Trail West, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page