Key facts

Capacity
80 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2020First generator online
Operator
Dominion Energy Inc.EIA operator ID 5248
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Mecklenburg County, VA36.8500, −78.4500
EIA plant ID
62813EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Grasshopper Solar produces

Free · EIA-923

Net generation, 2025

122 GWh

122,467 MWh, final

Capacity factor, 2025

17.5%

2024: 17.9%

January to July 2026

79.1 GWh

Provisional

Range, 2021 to 2025

122.5–173.5

GWh a year. Low 2025, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202024,405Not reported4 of 12
2021173,51124.8%12 of 12
2022165,03323.5%12 of 12
2023147,20921.0%12 of 12
2024125,63517.9%12 of 12
2025122,46717.5%12 of 12
2026 (provisional, partial year)79,12419.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GRHSSolar Photovoltaic80.0September 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Dominion Energy Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Grasshopper Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Grasshopper Solar

More plants operated by Dominion Energy Inc.

Questions about Grasshopper Solar

How much power does Grasshopper Solar produce?

Grasshopper Solar reported 122,467 MWh (122 GWh) of net generation in 2025, a 17.5% capacity factor on 80 MW of nameplate capacity. From January to July 2026 it reported 79.1 GWh, which is provisional.

Where is Grasshopper Solar?

Grasshopper Solar is in Mecklenburg County, Virginia, at 36.8500, −78.4500. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Grasshopper Solar?

EIA-860M for August 2026 lists Dominion Energy Inc. as the operator (EIA operator ID 5248). The operator is not always the owner.

When did Grasshopper Solar start operating?

Its first generator began operating in September 2020, according to EIA-860M.

Does InfraMap have power prices for Grasshopper Solar?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Grasshopper Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page