SolarBattery storageOperatingCAISO

Visalia Solar

Solar and battery storage project in Tulare County, California. 3.6 MW of nameplate capacity across 2 generators, operated by United Parcel Service.

Also known as EIA plant 68575

This project groups Visalia Solar (EIA 68575). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Amazon Visalia (FAT2)RE-VFO LLCPivot Energy PPA 22Shirk Energy StorageVisalia Solar1 km
Open in the map
5 plants within 3.0 km, from EIA coordinates.

Key facts

Capacity
3.6 MWSolar 2.5 · Battery storage 1.1
Generators
2 operatingEIA-860M, August 2026
Operating since
June 2024First generator online
Operator
United Parcel ServiceEIA operator ID 66953
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Tulare County, CA36.3614, −119.3926
EIA plant ID
68575EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Visalia Solar produces

Free · EIA-923

EIA-923 has no net generation reported for this plant.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
UPSB1Batteries1.1June 2024
UPSV1Solar Photovoltaic2.5June 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists United Parcel Service as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Visalia Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Visalia Solar

Questions about Visalia Solar

Where is Visalia Solar?

Visalia Solar is in Tulare County, California, at 36.3614, −119.3926. It is in the California Independent System Operator balancing area (CISO).

Who operates Visalia Solar?

EIA-860M for August 2026 lists United Parcel Service as the operator (EIA operator ID 66953). The operator is not always the owner.

Is Visalia Solar a solar or a battery storage plant?

Both. Solar capacity totals 2.5 MW and battery storage capacity totals 1.1 MW.

When did Visalia Solar start operating?

Its first generator began operating in June 2024, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page