Moseley Hermon Solar
Solar power plant in Chesterfield County, Virginia. 5 MW of nameplate capacity across 1 generator, operated by Moseley Hermon Solar.
Also known as EIA plant 68971
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- March 2026First generator online
- Operator
- Moseley Hermon SolarEIA operator ID 67183
- Grid
- PJMBalancing authority PJM
- Price nodes
- None linkedNo verified ISO node
- Location
- Chesterfield County, VA37.4675, −77.7335
- EIA plant ID
- 68971EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Moseley Hermon Solar produces
Free · EIA-923EIA-923 has no net generation reported for this plant.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 39302 | Solar Photovoltaic | 5.0 | March 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Moseley Hermon Solar as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Moseley Hermon Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Moseley Hermon Solar
Questions about Moseley Hermon Solar
Where is Moseley Hermon Solar?
Moseley Hermon Solar is in Chesterfield County, Virginia, at 37.4675, −77.7335. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Moseley Hermon Solar?
EIA-860M for August 2026 lists Moseley Hermon Solar as the operator (EIA operator ID 67183). The operator is not always the owner.
When did Moseley Hermon Solar start operating?
Its first generator began operating in March 2026, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location