SolarOperatingCAISO

1875 West Street Solar

Solar power plant in Tulare County, California. 2 MW of nameplate capacity across 1 generator, operated by ClearGen LLC.

Also known as EIA plant 70383

Analyst: free account, 1 question a day.

Central CA Fuel Cell 1, LLCTulare 1 and 2TWCGovernment Plaza Solar1875 West Street Solar5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2020First generator online
Operator
ClearGen LLCEIA operator ID 65849
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Tulare County, CA36.1830, −119.3660
EIA plant ID
70383EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power 1875 West Street Solar produces

Free · EIA-923

EIA-923 has no net generation reported for this plant.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SOLARSolar Photovoltaic2.0January 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists ClearGen LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query 1875 West Street Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near 1875 West Street Solar

More plants operated by ClearGen LLC

Questions about 1875 West Street Solar

Where is 1875 West Street Solar?

1875 West Street Solar is in Tulare County, California, at 36.1830, −119.3660. It is in the California Independent System Operator balancing area (CISO).

Who operates 1875 West Street Solar?

EIA-860M for August 2026 lists ClearGen LLC as the operator (EIA operator ID 65849). The operator is not always the owner.

When did 1875 West Street Solar start operating?

Its first generator began operating in January 2020, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page