HydroOperatingPJM

Belleville Dam

Hydro power plant in Wood County, West Virginia. 42 MW of nameplate capacity across 2 generators, operated by American Mun Power-Ohio, Inc.

Also known as Belleville Dam Power Plant · EIA plant 7594

Analyst: free account, 1 question a day.

Great Bend Solar ProjectMountaineerBHER Ravenswood Solar 1RacinePleasants Energy LLCBelleville Dam25 km
Open in the map
6 plants within 40 km, from EIA coordinates.

Key facts

Capacity
42 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 1999First generator online
Operator
American Mun Power-Ohio, IncEIA operator ID 40577
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Wood County, WV39.1192, −81.7375
EIA plant ID
7594EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Belleville Dam produces

Free · EIA-923

Net generation, 2025

257 GWh

256,915 MWh, final

Capacity factor, 2025

69.8%

2024: 60.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

215.0–316.6

GWh a year. Low 2020, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200394,502Not reported12 of 12
2004272,019Not reported12 of 12
2005201,673Not reported12 of 12
2006284,338Not reported12 of 12
2007209,753Not reported12 of 12
2008233,570Not reported12 of 12
2009282,373Not reported12 of 12
2010262,89471.5%12 of 12
2011245,37066.7%12 of 12
2012223,43760.6%12 of 12
2013296,23480.5%12 of 12
2014304,00782.6%12 of 12
2015261,27971.0%12 of 12
2016282,32976.5%12 of 12
2017279,02175.8%12 of 12
2018227,87061.9%12 of 12
2019267,35672.7%12 of 12
2020214,98258.3%12 of 12
2021316,59786.1%12 of 12
2022265,64172.2%12 of 12
2023272,22374.0%12 of 12
2024223,41660.6%12 of 12
2025256,91569.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric21.0June 1999
2Conventional Hydroelectric21.0June 1999

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists American Mun Power-Ohio, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Belleville Dam and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Belleville Dam

More plants operated by American Mun Power-Ohio, Inc

Questions about Belleville Dam

How much power does Belleville Dam produce?

Belleville Dam reported 256,915 MWh (257 GWh) of net generation in 2025, a 69.8% capacity factor on 42 MW of nameplate capacity.

Where is Belleville Dam?

Belleville Dam is in Wood County, West Virginia, at 39.1192, −81.7375. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Belleville Dam?

EIA-860M for August 2026 lists American Mun Power-Ohio, Inc as the operator (EIA operator ID 40577). The operator is not always the owner.

When did Belleville Dam start operating?

Its first generator began operating in June 1999, according to EIA-860M.

Does InfraMap have power prices for Belleville Dam?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Belleville Dam, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page