Natural gasOperatingFPL

Pea Ridge

Natural gas power plant in Santa Rosa County, Florida. 14.1 MW of nameplate capacity across 3 generators, operated by Florida Power & Light Co.

Also known as Pea Ridge Power Plant · EIA plant 7715

Analyst: free account, 1 question a day.

Santa Rosa Energy CenterBlackwater River Solar Energy CenterPea Ridge10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
14.1 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
April 1998First generator online
Operator
Florida Power & Light CoEIA operator ID 6452
Grid
FPLBalancing authority FPL
Price nodes
None linkedNo verified ISO node
Location
Santa Rosa County, FL30.5921, −87.1354
EIA plant ID
7715EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Pea Ridge produces

Free · EIA-923

Net generation, 2025

85.8 GWh

85,808 MWh, final

Capacity factor, 2025

69.5%

2024: 71.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

67.6–88.4

GWh a year. Low 2016, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200332,733Not reported12 of 12
200451,138Not reported12 of 12
200560,361Not reported12 of 12
200640,084Not reported12 of 12
200749,837Not reported12 of 12
200846,418Not reported12 of 12
200955,519Not reported12 of 12
201022,19918.0%12 of 12
201183,25067.4%12 of 12
201288,16271.2%12 of 12
201373,01859.1%12 of 12
201478,52563.6%12 of 12
201572,04558.3%12 of 12
201667,61154.6%12 of 12
201781,43065.9%12 of 12
201877,98063.1%12 of 12
201970,42057.0%12 of 12
202067,89054.8%12 of 12
202188,07871.3%12 of 12
202279,60164.4%12 of 12
202388,39971.6%12 of 12
202488,21571.2%12 of 12
202585,80869.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine4.7April 1998
2Natural Gas Fired Combustion Turbine4.7April 1998
3Natural Gas Fired Combustion Turbine4.7April 1998

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Florida Power & Light Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Pea Ridge and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Pea Ridge

More plants operated by Florida Power & Light Co

Questions about Pea Ridge

How much power does Pea Ridge produce?

Pea Ridge reported 85,808 MWh (85.8 GWh) of net generation in 2025, a 69.5% capacity factor on 14.1 MW of nameplate capacity.

Where is Pea Ridge?

Pea Ridge is in Santa Rosa County, Florida, at 30.5921, −87.1354. It is in the Florida Power & Light Company balancing area (FPL).

Who operates Pea Ridge?

EIA-860M for August 2026 lists Florida Power & Light Co as the operator (EIA operator ID 6452). The operator is not always the owner.

When did Pea Ridge start operating?

Its first generator began operating in April 1998, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page