Natural gasOil and landfill gasOperatingSPP

Terry Bundy Generating Station

Natural gas power plant in Lancaster County, Nebraska. 216.3 MW of nameplate capacity across 8 generators, operated by Lincoln Electric System.

Also known as EIA plant 7887

Analyst: free account, 1 question a day.

Archer Daniels Midland LincolnJ StreetRokebyTerry Bundy10 km
Open in the map
5 plants within 22 km, from EIA coordinates.

Key facts

Capacity
216.3 MWNatural gas 209.7 · Oil and landfill gas 6.6
Generators
8 operatingEIA-860M, August 2026
Operating since
August 2003First generator online
Operator
Lincoln Electric SystemEIA operator ID 11018
Grid
SPPBalancing authority SWPP
Price nodes
3 SPP nodesResource nodes with prices
Location
Lancaster County, NE40.9097, −96.6131
EIA plant ID
7887EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Terry Bundy produces

Free · EIA-923

Net generation, 2025

136 GWh

136,016 MWh, final

Capacity factor, 2025

7.2%

2024: 8.3%

January to July 2026

73.6 GWh

Provisional

Range, 2016 to 2025

89.1–229.8

GWh a year. Low 2023, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
20030Not reported3 of 12
2004108,074Not reported12 of 12
2005184,484Not reported12 of 12
2006135,876Not reported12 of 12
2007212,908Not reported12 of 12
200851,476Not reported7 of 12
200954,900Not reported12 of 12
2010109,8347.5%12 of 12
201186,9075.9%12 of 12
2012139,228Not reported12 of 12
201378,421Not reported12 of 12
201459,8374.7%8 of 12
20158,8432.8%2 of 12
2016190,76810.0%12 of 12
2017148,8147.9%12 of 12
2018229,83612.1%12 of 12
2019197,38410.4%12 of 12
2020184,5079.7%12 of 12
2021222,23911.7%12 of 12
2022223,93711.8%12 of 12
202389,0834.7%12 of 12
2024158,3708.3%12 of 12
2025136,0167.2%12 of 12
2026 (provisional, partial year)73,5916.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

69,672

US short tons. 2024: 83,580

SO₂, 2025

1

US short tons

NOx, 2025

41

US short tons

CO₂ per MWh, calculated

0.51 t

About 1,024 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (SVGS2, SVGS3, SVGS4), matched to EIA plant 7887 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combined Cycle28.2August 2004
2Natural Gas Fired Combined Cycle60.5October 2003
3Natural Gas Fired Combined Cycle60.5April 2004
4Natural Gas Fired Combustion Turbine60.5August 2003
BSUPetroleum Liquids1.8July 2004
LFG1Landfill Gas1.6January 2014
LFG2Landfill Gas1.6January 2014
LFG3Landfill Gas1.6January 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lincoln Electric System as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Terry Bundy Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Terry Bundy

More plants operated by Lincoln Electric System

Questions about Terry Bundy

How much power does Terry Bundy Generating Station produce?

Terry Bundy Generating Station reported 136,016 MWh (136 GWh) of net generation in 2025, a 7.2% capacity factor on 216.3 MW of nameplate capacity. From January to July 2026 it reported 73.6 GWh, which is provisional.

Where is Terry Bundy Generating Station?

Terry Bundy Generating Station is in Lancaster County, Nebraska, at 40.9097, −96.6131. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Terry Bundy Generating Station?

EIA-860M for August 2026 lists Lincoln Electric System as the operator (EIA operator ID 11018). The operator is not always the owner.

When did Terry Bundy Generating Station start operating?

Its first generator began operating in August 2003, according to EIA-860M.

Does InfraMap have power prices for Terry Bundy Generating Station?

Yes. InfraMap has SPP day-ahead and real-time prices at 3 price nodes linked to Terry Bundy Generating Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page