HydroOperatingPACE

Hydro Plant No 3

Hydro power plant in Sanpete County, Utah. 2.8 MW of nameplate capacity across 2 generators, operated by City of Ephraim - (UT).

Also known as EIA plant 925

Analyst: free account, 1 question a day.

Manti LowerHunter Solar LLC (UT)HunterHuntingtonGreen River Energy Center - HybridHydro Plant No 310 km
Open in the map
6 plants within 30 km, from EIA coordinates.

Key facts

Capacity
2.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
September 1984First generator online
Operator
City of Ephraim - (UT)EIA operator ID 5932
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Sanpete County, UT39.2056, −111.3344
EIA plant ID
925EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hydro Plant No 3 produces

Free · EIA-923

Net generation, 2025

1.53 GWh

1,533 MWh, final

Capacity factor, 2025

6.2%

2024: 18.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.5–4.6

GWh a year. Low 2025, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
20015,720Not reported12 of 12
200219,408Not reported12 of 12
20031,799Not reported12 of 12
20041,832Not reported12 of 12
20051,805Not reported12 of 12
2006794Not reported12 of 12
20076Not reported12 of 12
20085,790Not reported12 of 12
20096,447Not reported12 of 12
20101,0434.3%12 of 12
20116,43826.2%12 of 12
20124,68519.0%12 of 12
20133,38713.8%12 of 12
20142,75011.2%12 of 12
20152,80011.4%12 of 12
20162,70011.0%12 of 12
20172,1258.7%12 of 12
20182,4069.8%12 of 12
20192,94412.0%12 of 12
20202,3609.6%12 of 12
20211,7767.2%12 of 12
20221,7897.3%12 of 12
20232,75111.2%12 of 12
20244,62018.8%12 of 12
20251,5336.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Conventional Hydroelectric0.7September 1984
3Conventional Hydroelectric2.1September 1984

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Ephraim - (UT) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hydro Plant No 3 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hydro Plant No 3

Questions about Hydro Plant No 3

How much power does Hydro Plant No 3 produce?

Hydro Plant No 3 reported 1,533 MWh (1.53 GWh) of net generation in 2025, a 6.2% capacity factor on 2.8 MW of nameplate capacity.

Where is Hydro Plant No 3?

Hydro Plant No 3 is in Sanpete County, Utah, at 39.2056, −111.3344. It is in the PacifiCorp - East balancing area (PACE).

Who operates Hydro Plant No 3?

EIA-860M for August 2026 lists City of Ephraim - (UT) as the operator (EIA operator ID 5932). The operator is not always the owner.

When did Hydro Plant No 3 start operating?

Its first generator began operating in September 1984, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page