CoalOperatingPACE

Huntington

Coal power plant in Emery County, Utah. 1,015.5 MW of nameplate capacity across 2 generators, operated by PacifiCorp.

Also known as Huntington Power Plant · EIA plant 8069

Analyst: free account, 1 question a day.

Castle Solar, LLCHunterHornshadow Solar II, LLCHunter Solar LLC (UT)Hydro Plant No 3Huntington10 km
Open in the map
6 plants within 29 km, from EIA coordinates.

Key facts

Capacity
1,015.5 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1974First generator online
Operator
PacifiCorpEIA operator ID 14354
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Emery County, UT39.3792, −111.0781
EIA plant ID
8069EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Huntington produces

Free · EIA-923

Net generation, 2025

4.26 TWh

4,260,189 MWh, final

Capacity factor, 2025

47.9%

2024: 29.8%

January to July 2026

2.74 TWh

Provisional

Range, 2015 to 2025

2.7–6.3

TWh a year. Low 2024, high 2021

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20007,053,195Not reported12 of 12
20016,241,528Not reported12 of 12
20025,977,918Not reported12 of 12
20037,213,228Not reported12 of 12
20046,388,640Not reported12 of 12
20056,381,332Not reported12 of 12
20066,139,007Not reported12 of 12
20077,127,001Not reported12 of 12
2008570,332Not reported1 of 12
20096,753,764Not reported12 of 12
20106,107,37970.0%12 of 12
20115,951,65868.2%12 of 12
20126,744,16077.1%12 of 12
20136,765,95777.5%12 of 12
20142,158,024Not reported4 of 12
20155,988,31865.9%12 of 12
20165,503,89060.4%12 of 12
20175,399,77759.4%12 of 12
20185,087,82456.0%12 of 12
20194,897,52553.9%12 of 12
20204,515,30549.6%12 of 12
20216,263,65868.9%12 of 12
20225,673,11562.4%12 of 12
20233,400,881Not reported12 of 12
20242,655,40029.8%12 of 12
20254,260,18947.9%12 of 12
2026 (provisional, partial year)2,740,52453.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

4.90M

US short tons. 2024: 3.33M

SO₂, 2025

1,631

US short tons

NOx, 2025

4,876

US short tons

CO₂ per MWh, calculated

1.15 t

About 2,299 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 8069 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,944

million gallons

Consumption, 2024

1,944

million gallons

Source

Huntington Creek

Surface, Fresh. Induced-draft tower

Watershed stress

Severe · 0.908

USGS SUI, HUC12 Huntington Lake-Huntington Creek

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal498.0June 1977
2Conventional Steam Coal517.5July 1974

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists PacifiCorp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Huntington and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Huntington

More plants operated by PacifiCorp

Questions about Huntington

How much power does Huntington produce?

Huntington reported 4,260,189 MWh (4.26 TWh) of net generation in 2025, a 47.9% capacity factor on 1,015.5 MW of nameplate capacity. From January to July 2026 it reported 2.74 TWh, which is provisional.

Where is Huntington?

Huntington is in Emery County, Utah, at 39.3792, −111.0781. It is in the PacifiCorp - East balancing area (PACE).

Who operates Huntington?

EIA-860M for August 2026 lists PacifiCorp as the operator (EIA operator ID 14354). The operator is not always the owner.

When did Huntington start operating?

Its first generator began operating in July 1974, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page