Natural gasOperatingPACE

Lake Side Power Plant

Natural gas power plant in Utah County, Utah. 1,246.5 MW of nameplate capacity across 6 generators, operated by PacifiCorp.

Also known as EIA plant 56237

Analyst: free account, 1 question a day.

Provo Power PlantBYU Central Heating PlantWhiteheadDeer Creek (UT)Swire Coca-Cola DraperSpanish Fork Community SolarLake Side10 km
Open in the map
6 plants within 25 km, from EIA coordinates.

Key facts

Capacity
1,246.5 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
September 2007First generator online
Operator
PacifiCorpEIA operator ID 14354
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Utah County, UT40.3317, −111.7542
EIA plant ID
56237EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lake Side produces

Free · EIA-923

Net generation, 2025

6.05 TWh

6,049,458 MWh, final

Capacity factor, 2025

55.4%

2024: 55.8%

January to July 2026

3.45 TWh

Provisional

Range, 2015 to 2025

3.3–6.6

TWh a year. Low 2017, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
20071,619,621Not reported12 of 12
20082,814,387Not reported12 of 12
20092,297,637Not reported12 of 12
20102,568,92749.6%12 of 12
20111,851,30335.7%12 of 12
20122,890,93855.7%12 of 12
20132,508,960Not reported12 of 12
20144,358,737Not reported12 of 12
20154,549,27437.5%12 of 12
20165,726,04247.1%12 of 12
20173,340,56127.5%12 of 12
20184,861,16940.1%12 of 12
20195,063,90241.7%12 of 12
20205,560,11245.7%12 of 12
20216,389,35552.7%12 of 12
20226,578,67354.2%12 of 12
20236,454,629Not reported12 of 12
20246,106,34555.8%12 of 12
20256,049,45855.4%12 of 12
2026 (provisional, partial year)3,450,07754.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.58M

US short tons. 2024: 2.66M

SO₂, 2025

13

US short tons

NOx, 2025

151

US short tons

CO₂ per MWh, calculated

0.43 t

About 853 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (CT01, CT02, CT03, CT04), matched to EIA plant 56237 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,547

million gallons

Consumption, 2024

1,338

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.193

USGS SUI, HUC12 Lower American Fork-Frontal Utah Lake

24 of 24 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT01Natural Gas Fired Combined Cycle182.7September 2007
CT02Natural Gas Fired Combined Cycle182.7September 2007
CT21Natural Gas Fired Combined Cycle185.4May 2014
CT22Natural Gas Fired Combined Cycle185.4May 2014
ST01Natural Gas Fired Combined Cycle225.9September 2007
ST2Natural Gas Fired Combined Cycle284.4May 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists PacifiCorp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lake Side Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lake Side

More plants operated by PacifiCorp

Questions about Lake Side

How much power does Lake Side Power Plant produce?

Lake Side Power Plant reported 6,049,458 MWh (6.05 TWh) of net generation in 2025, a 55.4% capacity factor on 1,246.5 MW of nameplate capacity. From January to July 2026 it reported 3.45 TWh, which is provisional.

Where is Lake Side Power Plant?

Lake Side Power Plant is in Utah County, Utah, at 40.3317, −111.7542. It is in the PacifiCorp - East balancing area (PACE).

Who operates Lake Side Power Plant?

EIA-860M for August 2026 lists PacifiCorp as the operator (EIA operator ID 14354). The operator is not always the owner.

When did Lake Side Power Plant start operating?

Its first generator began operating in September 2007, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page