Hourly settlement-metered net energy for reviewed ERCOT resources, March 2014 to July 2026, with battery telemetry and resource registries.

Updated November 2, 2026

About the data

ERCOT’s 60-Day SCED Disclosure gives hourly settlement metered net energy for reviewed ERCOT resources, shown in the Output tab’s Hourly view. It is also the dispatch data behind the ERCOT-fitted curtailment response.

After ERCOT’s RTC+B go-live on December 5, 2025, telemetered battery power from the energy storage disclosure is integrated into hourly charge and discharge estimates. These are telemetry estimates, not settlement metering.

ERCOT and PUCT resource and settlement point registries tie EIA plants to ERCOT resources and nodes. The crosswalk covers 611 grouped projects above 20 MW: 589 have reviewed resource IDs and nodes for every eligible generator, 7 are partial and 15 unresolved.

Net energy
March 2014 to July 2026
Battery telemetry
December 5, 2025 to July 31, 2026
Registry
Effective September 22, 2026; 611 projects above 20 MW reviewed
Grain
Hourly, by resource
Updates
Published with a 60-day delay

Access

Free for everyone, with no account.

Where it appears: Output tab, Prices tab.

MCP tools that return it: get_ercot_project_data, get_project_battery_operations, analyze_battery_period, rank_ercot_basis. The MCP server is part of Pro; setup is on MCP server.

Sources

Periods and update notes for each source are on Data sources.

Known gaps

Limits
  • Net energy does not separate battery charging from discharge.
  • The battery regimes before and after RTC+B are different measurements and do not form one continuous metered series.
  • An hour needs four complete quarter-hours from every contributing resource. Otherwise the combined hour is unavailable.

Missing values stay missing: a null means the source has no usable record, never zero. Zero and negative values are shown as reported.

How InfraMap uses it

How InfraMap joins, groups and calculates with this dataset is on Methodology.

Questions it answers

  • Which reviewed ERCOT wind projects had the most negative basis to West Hub in March 2026?
  • How did a Texas battery’s hourly charge and discharge change after RTC+B went live in December 2025?
  • What was the hourly net energy of a reviewed ERCOT solar project on July 15, 2026?

Ask the analyst

Terms: Battery energy storage (BESS), Basis, Capture price and capture rate.