HydroOperatingMISO

Hoot Lake

Hydro power plant in Otter Tail County, Minnesota. 1 MW of nameplate capacity across 1 generator, operated by Otter Tail Power Co.

Also known as Hoot Lake Power Plant · EIA plant 1943

Analyst: free account, 1 question a day.

Lake Region Community Hybrid, LLCLakeswind Power PartnersGrant County Wind LLCHoot Lake25 km
Open in the map
4 plants within 56 km, from EIA coordinates.

Key facts

Capacity
1 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 1914First generator online
Operator
Otter Tail Power CoEIA operator ID 14232
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Otter Tail County, MN46.2906, −96.0433
EIA plant ID
1943EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hoot Lake produces

Free · EIA-923

Net generation, 2025

3.59 GWh

3,587 MWh, final

Capacity factor, 2025

40.9%

2024: 37.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.8–528.7

GWh a year. Low 2023, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000750,026Not reported12 of 12
2001824,445Not reported12 of 12
2002834,167Not reported12 of 12
2003917,575Not reported12 of 12
2004744,992Not reported12 of 12
2005934,548Not reported12 of 12
2006872,939Not reported12 of 12
2007957,149Not reported12 of 12
2008770,678Not reported12 of 12
2009623,506Not reported12 of 12
2010836,01173.0%12 of 12
2011792,66669.2%12 of 12
2012658,80757.4%12 of 12
2013813,24571.6%12 of 12
2014586,23551.2%12 of 12
2015301,10326.3%12 of 12
2016222,09519.3%12 of 12
2017253,94622.2%12 of 12
2018528,69346.2%12 of 12
2019319,05927.9%12 of 12
2020203,64017.7%12 of 12
2021126,450Not reported6 of 12
20222,68530.7%12 of 12
20231,81420.7%12 of 12
20243,29037.5%12 of 12
20253,58740.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2021

161,846

US short tons. 2020: 262,408

SO₂, 2021

495

US short tons

NOx, 2021

229

US short tons

2 of 2 EPA units reported CO₂ in 2021 (2, 3), matched to EIA plant 1943 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
H1Conventional Hydroelectric1.0September 1914

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Otter Tail Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hoot Lake and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hoot Lake

More plants operated by Otter Tail Power Co

Questions about Hoot Lake

How much power does Hoot Lake produce?

Hoot Lake reported 3,587 MWh (3.59 GWh) of net generation in 2025, a 40.9% capacity factor on 1 MW of nameplate capacity.

Where is Hoot Lake?

Hoot Lake is in Otter Tail County, Minnesota, at 46.2906, −96.0433. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Hoot Lake?

EIA-860M for August 2026 lists Otter Tail Power Co as the operator (EIA operator ID 14232). The operator is not always the owner.

When did Hoot Lake start operating?

Its first generator began operating in September 1914, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page