CoalOperatingAECI

New Madrid

Coal power plant in New Madrid County, Missouri. 1,300 MW of nameplate capacity across 2 generators, operated by Associated Electric Coop, Inc.

Also known as New Madrid Power Plant · EIA plant 2167

Analyst: free account, 1 question a day.

New Madrid Solar, LLCRidgely Energy FarmSikeston Power StationEssexOETN1KennettNew Madrid25 km
Open in the map
6 plants within 54 km, from EIA coordinates.

Key facts

Capacity
1,300 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
October 1972First generator online
Operator
Associated Electric Coop, IncEIA operator ID 924
Grid
AECIBalancing authority AECI
Price nodes
None linkedNo verified ISO node
Location
New Madrid County, MO36.5147, −89.5617
EIA plant ID
2167EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power New Madrid produces

Free · EIA-923

Net generation, 2025

6.74 TWh

6,738,552 MWh, final

Capacity factor, 2025

59.2%

2024: Not reported

January to July 2026

3.92 TWh

Provisional

Range, 2015 to 2025

4.7–7.9

TWh a year. Low 2023, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20007,598,982Not reported12 of 12
20017,154,141Not reported12 of 12
20027,606,958Not reported12 of 12
20037,394,399Not reported12 of 12
20047,668,430Not reported12 of 12
20057,000,958Not reported12 of 12
20067,659,009Not reported12 of 12
20077,623,016Not reported12 of 12
20087,518,888Not reported12 of 12
20097,246,811Not reported12 of 12
20107,496,14571.3%12 of 12
20117,287,06269.3%12 of 12
20127,762,886Not reported12 of 12
20138,193,89672.0%12 of 12
20148,332,09173.2%12 of 12
20156,594,72857.9%12 of 12
20166,760,837Not reported12 of 12
20177,597,89966.7%12 of 12
20187,902,54369.4%12 of 12
20196,880,55360.4%12 of 12
20206,180,98954.1%12 of 12
20215,649,26949.6%12 of 12
20227,691,96167.5%12 of 12
20234,710,70441.4%12 of 12
20245,325,976Not reported12 of 12
20256,738,55259.2%12 of 12
2026 (provisional, partial year)3,917,77659.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

6.63M

US short tons. 2024: 5.37M

SO₂, 2025

11,530

US short tons

NOx, 2025

14,335

US short tons

CO₂ per MWh, calculated

0.98 t

About 1,968 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 2167 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

245,719

million gallons

Consumption, 2024

1,229

million gallons

Source

Mississippi River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.184

USGS SUI, HUC12 Portage Open Bay

24 of 24 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal650.0October 1972
2Conventional Steam Coal650.0June 1977

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Associated Electric Coop, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query New Madrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near New Madrid

More plants operated by Associated Electric Coop, Inc

Questions about New Madrid

How much power does New Madrid produce?

New Madrid reported 6,738,552 MWh (6.74 TWh) of net generation in 2025, a 59.2% capacity factor on 1,300 MW of nameplate capacity. From January to July 2026 it reported 3.92 TWh, which is provisional.

Where is New Madrid?

New Madrid is in New Madrid County, Missouri, at 36.5147, −89.5617. It is in the Associated Electric Cooperative, Inc. balancing area (AECI).

Who operates New Madrid?

EIA-860M for August 2026 lists Associated Electric Coop, Inc as the operator (EIA operator ID 924). The operator is not always the owner.

When did New Madrid start operating?

Its first generator began operating in October 1972, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page