Natural gasOperatingDUK

James E. Rogers Energy Complex

Natural gas power plant in Cleveland County, North Carolina. 1,530.5 MW of nameplate capacity across 2 generators, operated by Duke Energy Carolinas, LLC.

Also known as Cliffside Steam Station · EIA plant 2721

Analyst: free account, 1 question a day.

Broad River Solar, LLCCharlotte SolarRutherford FarmBeetle SolarOld Caroleen Solar FarmSophie SolarJames E. Rogers Energ…5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
1,530.5 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 1972First generator online
Operator
Duke Energy Carolinas, LLCEIA operator ID 5416
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Cleveland County, NC35.2200, −81.7594
EIA plant ID
2721EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power James E. Rogers Energy Complex produces

Free · EIA-923

Net generation, 2025

6.19 TWh

6,186,918 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

2.35 TWh

Provisional

Range, 2015 to 2025

3.7–6.4

TWh a year. Low 2016, high 2019

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20004,051,924Not reported12 of 12
20013,729,416Not reported12 of 12
20022,723,353Not reported12 of 12
20034,346,373Not reported12 of 12
20043,464,342Not reported12 of 12
20053,733,245Not reported12 of 12
20064,075,250Not reported12 of 12
20074,070,964Not reported12 of 12
20084,318,076Not reported12 of 12
20093,269,340Not reported12 of 12
20102,561,74837.4%12 of 12
20112,628,261Not reported12 of 12
20121,181,769Not reported12 of 12
20136,220,23648.0%12 of 12
20146,053,80846.7%12 of 12
20154,082,513Not reported12 of 12
20163,681,96827.4%12 of 12
20175,825,79043.5%12 of 12
20185,554,47341.4%12 of 12
20196,368,17247.5%12 of 12
20205,259,42839.1%12 of 12
20214,751,18535.4%12 of 12
20225,011,651Not reported12 of 12
20235,244,80739.1%12 of 12
20244,423,834Not reported11 of 12
20256,186,918Not reported12 of 12
2026 (provisional, partial year)2,350,738Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

4.86M

US short tons. 2024: 4.26M

SO₂, 2025

974

US short tons

NOx, 2025

2,134

US short tons

CO₂ per MWh, calculated

0.79 t

About 1,571 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6), matched to EIA plant 2721 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

4,532

million gallons

Consumption, 2024

1,879

million gallons

Source

Broad River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.137

USGS SUI, HUC12 Suck Creek-Broad River

24 of 24 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
5Natural Gas Steam Turbine621.0June 1972
6Natural Gas Steam Turbine909.5December 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Carolinas, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query James E. Rogers Energy Complex and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near James E. Rogers Energy Complex

More plants operated by Duke Energy Carolinas, LLC

Questions about James E. Rogers Energy Complex

How much power does James E. Rogers Energy Complex produce?

James E. Rogers Energy Complex reported 6,186,918 MWh (6.19 TWh) of net generation in 2025. From January to July 2026 it reported 2.35 TWh, which is provisional.

Where is James E. Rogers Energy Complex?

James E. Rogers Energy Complex is in Cleveland County, North Carolina, at 35.2200, −81.7594. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates James E. Rogers Energy Complex?

EIA-860M for August 2026 lists Duke Energy Carolinas, LLC as the operator (EIA operator ID 5416). The operator is not always the owner.

When did James E. Rogers Energy Complex start operating?

Its first generator began operating in June 1972, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page