CoalOperatingTVA

Kingston

Coal power plant in Roane County, Tennessee. 1,700 MW of nameplate capacity across 9 generators, operated by Tennessee Valley Authority.

Also known as Kingston Steam Plant · EIA plant 3407

Analyst: free account, 1 question a day.

Melton HillPrimient Loudon PlantFort LoudounWatts Bar HydroDMAT Denso - SEAT Sol…Kingston25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
1,700 MWNameplate
Generators
9 operatingEIA-860M, August 2026
Operating since
February 1954First generator online
Operator
Tennessee Valley AuthorityEIA operator ID 18642
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Roane County, TN35.8992, −84.5194
EIA plant ID
3407EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Kingston produces

Free · EIA-923

Net generation, 2025

3.38 TWh

3,382,008 MWh, final. 11 of 12 months reported

Capacity factor, 2025

24.6%

2024: 23.2%

January to July 2026

1.91 TWh

Provisional

Range, 2015 to 2024

1.5–5.2

TWh a year. Low 2020, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20009,778,492Not reported12 of 12
20019,094,952Not reported12 of 12
20029,866,292Not reported12 of 12
20039,454,233Not reported12 of 12
20049,049,917Not reported12 of 12
20059,479,726Not reported12 of 12
200610,377,572Not reported12 of 12
200710,140,510Not reported12 of 12
200810,272,684Not reported12 of 12
20091,910,944Not reported10 of 12
20102,808,86128.2%8 of 12
20114,715,67531.7%12 of 12
20123,748,93027.3%11 of 12
20133,944,78626.5%12 of 12
20145,063,43334.0%12 of 12
20153,857,821Not reported12 of 12
20165,192,64434.8%12 of 12
20174,635,01731.1%12 of 12
20183,047,41320.5%12 of 12
20193,320,00622.3%12 of 12
20201,482,649Not reported12 of 12
20212,775,508Not reported12 of 12
20223,126,43221.0%12 of 12
20232,412,07916.2%12 of 12
20243,460,56923.2%12 of 12
20253,382,00824.6%11 of 12
2026 (provisional, partial year)1,911,06522.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

4.65M

US short tons. 2024: 4.40M

SO₂, 2025

3,148

US short tons

NOx, 2025

1,763

US short tons

9 of 9 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6, 7, 8, and others), matched to EIA plant 3407 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

378,452

million gallons

Consumption, 2024

Not reported

million gallons

Source

Clinch And Emory Rivers

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.135

USGS SUI, HUC12 Lower Emory River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal175.0February 1954
2Conventional Steam Coal175.0April 1954
3Conventional Steam Coal175.0June 1954
4Conventional Steam Coal175.0July 1954
5Conventional Steam Coal200.0January 1955
6Conventional Steam Coal200.0March 1955
7Conventional Steam Coal200.0May 1955
8Conventional Steam Coal200.0August 1955
9Conventional Steam Coal200.0December 1955

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tennessee Valley Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Kingston and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Kingston

More plants operated by Tennessee Valley Authority

Questions about Kingston

How much power does Kingston produce?

Kingston reported 3,382,008 MWh (3.38 TWh) of net generation in 2025, a 24.6% capacity factor on 1,700 MW of nameplate capacity. From January to July 2026 it reported 1.91 TWh, which is provisional. 11 of 12 months were reported for 2025.

Where is Kingston?

Kingston is in Roane County, Tennessee, at 35.8992, −84.5194. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Kingston?

EIA-860M for August 2026 lists Tennessee Valley Authority as the operator (EIA operator ID 18642). The operator is not always the owner.

When did Kingston start operating?

Its first generator began operating in February 1954, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)