HydroOperatingTIDC

Woodward Power Plant

Hydro power plant in Stanislaus County, California. 2.8 MW of nameplate capacity across 1 generator, operated by Turlock Irrigation District.

Also known as EIA plant 50218

Analyst: free account, 1 question a day.

Frankenheimer Power PlantDa Silva DairyAxium Modesto SolarERock MID Claribel Generation StationAmeresco San JoaquinWoodward10 km
Open in the map
6 plants within 19 km, from EIA coordinates.

Key facts

Capacity
2.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 1982First generator online
Operator
Turlock Irrigation DistrictEIA operator ID 19281
Grid
TIDCBalancing authority TIDC
Price nodes
None linkedNo verified ISO node
Location
Stanislaus County, CA37.8607, −120.8792
EIA plant ID
50218EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Woodward produces

Free · EIA-923

Net generation, 2025

−13 MWh

−13 MWh, final

Capacity factor, 2025

-0.1%

2024: -0.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.0–3.1

GWh a year. Low 2022, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20015,628Not reported12 of 12
200215,219Not reported12 of 12
2003Not reportedNot reported0 of 12
20042,629Not reported12 of 12
20054,991Not reported12 of 12
20065,503Not reported12 of 12
20075,543Not reported12 of 12
20085,674Not reported12 of 12
20095,202Not reported12 of 12
20105,00020.4%12 of 12
20115,45022.2%12 of 12
20124,23317.2%12 of 12
20134,94320.2%12 of 12
20143,24113.2%12 of 12
20151,4545.9%12 of 12
20162,3599.6%12 of 12
20173,06512.5%12 of 12
20182,67410.9%12 of 12
20192,2039.0%12 of 12
20201,8667.6%12 of 12
20211,0844.4%12 of 12
2022−26-0.1%12 of 12
2023−17-0.1%12 of 12
2024−20-0.1%12 of 12
2025−13-0.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
U1Conventional Hydroelectric2.8April 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Turlock Irrigation District as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Woodward Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Woodward

More plants operated by Turlock Irrigation District

Questions about Woodward

How much power does Woodward Power Plant produce?

Woodward Power Plant reported −13 MWh (−13 MWh) of net generation in 2025.

Where is Woodward Power Plant?

Woodward Power Plant is in Stanislaus County, California, at 37.8607, −120.8792. It is in the Turlock Irrigation District balancing area (TIDC).

Who operates Woodward Power Plant?

EIA-860M for August 2026 lists Turlock Irrigation District as the operator (EIA operator ID 19281). The operator is not always the owner.

When did Woodward Power Plant start operating?

Its first generator began operating in April 1982, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page