HydroOperatingNYISO

Hewittville Hydroelectric

Hydro power plant in St Lawrence County, New York. 3 MW of nameplate capacity across 1 generator, operated by Erie Boulevard Hydropower LP.

Also known as Hewittville Power Station · EIA plant 50268

Analyst: free account, 1 question a day.

Unionville Hydro Project 2499 NYSissonville HydroNorwoodNY Lancaster Shisler Rd Site 2 Solar CSGClarkson SolarHewittville Hydroelectric2 km
Open in the map
6 plants within 5.9 km, from EIA coordinates.

Key facts

Capacity
3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 1984First generator online
Operator
Erie Boulevard Hydropower LPEIA operator ID 5914
Grid
NYISOBalancing authority NYIS
Price nodes
None linkedNo verified ISO node
Location
St Lawrence County, NY44.7052, −75.0079
EIA plant ID
50268EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hewittville Hydroelectric produces

Free · EIA-923

Net generation, 2025

12.4 GWh

12,404 MWh, final

Capacity factor, 2025

47.2%

2024: 52.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

11.8–16.1

GWh a year. Low 2020, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200115,094Not reported12 of 12
200215,436Not reported12 of 12
200316,030Not reported12 of 12
200416,615Not reported12 of 12
200516,590Not reported12 of 12
200617,268Not reported12 of 12
20076,971Not reported12 of 12
200816,541Not reported12 of 12
200917,416Not reported12 of 12
201017,43966.4%12 of 12
201116,83064.0%12 of 12
201213,40350.9%12 of 12
201317,59667.0%12 of 12
201414,62255.6%12 of 12
201514,39754.8%12 of 12
201614,09153.5%12 of 12
201716,12861.4%12 of 12
201813,39751.0%12 of 12
201915,57359.3%12 of 12
202011,81644.8%12 of 12
202114,33054.5%12 of 12
202214,58655.5%12 of 12
202313,21450.3%12 of 12
202413,82252.5%12 of 12
202512,40447.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HY1Conventional Hydroelectric3.0September 1984

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Erie Boulevard Hydropower LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hewittville Hydroelectric and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hewittville Hydroelectric

More plants operated by Erie Boulevard Hydropower LP

Questions about Hewittville Hydroelectric

How much power does Hewittville Hydroelectric produce?

Hewittville Hydroelectric reported 12,404 MWh (12.4 GWh) of net generation in 2025, a 47.2% capacity factor on 3 MW of nameplate capacity.

Where is Hewittville Hydroelectric?

Hewittville Hydroelectric is in St Lawrence County, New York, at 44.7052, −75.0079. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Hewittville Hydroelectric?

EIA-860M for August 2026 lists Erie Boulevard Hydropower LP as the operator (EIA operator ID 5914). The operator is not always the owner.

When did Hewittville Hydroelectric start operating?

Its first generator began operating in September 1984, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page