HydroOperatingNYISO

Fort Miller Hydroelectric Facility

Hydro power plant in Saratoga County, New York. 5 MW of nameplate capacity across 2 generators, operated by Albany Engineering Corporation.

Also known as EIA plant 50514

Analyst: free account, 1 question a day.

SchuylervilleMiddle Falls HydroNY 5 King LLCGreenwich Solar 1, LLC CSGFort Miller Hydroelec…5 km
Open in the map
6 plants within 10 km, from EIA coordinates.

Key facts

Capacity
5 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
December 1984First generator online
Operator
Albany Engineering CorporationEIA operator ID 58756
Grid
NYISOBalancing authority NYIS
Price nodes
None linkedNo verified ISO node
Location
Saratoga County, NY43.1609, −73.5841
EIA plant ID
50514EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fort Miller Hydroelectric Facility produces

Free · EIA-923

Net generation, 2025

3.37 GWh

3,367 MWh, final

Capacity factor, 2025

7.7%

2024: 33.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

3.4–27.4

GWh a year. Low 2025, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001211,969Not reported12 of 12
200221,637Not reported12 of 12
200326,358Not reported12 of 12
200424,987Not reported12 of 12
200526,421Not reported12 of 12
200633,386Not reported12 of 12
200724,251Not reported12 of 12
200826,397Not reported12 of 12
200922,803Not reported12 of 12
201023,06652.7%12 of 12
201128,71265.6%12 of 12
201220,77247.3%12 of 12
201323,94754.7%12 of 12
201424,26855.4%12 of 12
201520,09045.9%12 of 12
201619,33744.0%12 of 12
201727,35062.4%12 of 12
201822,66151.7%12 of 12
201916,91238.6%12 of 12
202021,10448.1%12 of 12
202120,22746.2%12 of 12
202218,70742.7%12 of 12
202319,52644.6%12 of 12
202414,81133.7%12 of 12
20253,3677.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Conventional Hydroelectric2.5December 1984
GEN2Conventional Hydroelectric2.5December 1984

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Albany Engineering Corporation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fort Miller Hydroelectric Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fort Miller Hydroelectric Facility

More plants operated by Albany Engineering Corporation

Questions about Fort Miller Hydroelectric Facility

How much power does Fort Miller Hydroelectric Facility produce?

Fort Miller Hydroelectric Facility reported 3,367 MWh (3.37 GWh) of net generation in 2025, a 7.7% capacity factor on 5 MW of nameplate capacity.

Where is Fort Miller Hydroelectric Facility?

Fort Miller Hydroelectric Facility is in Saratoga County, New York, at 43.1609, −73.5841. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Fort Miller Hydroelectric Facility?

EIA-860M for August 2026 lists Albany Engineering Corporation as the operator (EIA operator ID 58756). The operator is not always the owner.

When did Fort Miller Hydroelectric Facility start operating?

Its first generator began operating in December 1984, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page