Natural gasOperatingCAISO

Municipal Cogen Plant

Natural gas power plant in Riverside County, California. 1.2 MW of nameplate capacity across 1 generator, operated by Palm Springs, City of - (CA).

Also known as EIA plant 50674

Analyst: free account, 1 question a day.

Palm Springs DAC PVHecate Energy Desert Storage 1 LLCWildcat I Energy Storage LLCMountain View IVEdom Hills Project 1…Municipal Cogen Plant2 km
Open in the map
6 plants within 7.9 km, from EIA coordinates.

Key facts

Capacity
1.2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2015First generator online
Operator
Palm Springs, City of - (CA)EIA operator ID 14395
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Riverside County, CA33.8247, −116.5106
EIA plant ID
50674EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Municipal Cogen Plant produces

Free · EIA-923

Net generation, 2025

6.24 GWh

6,242 MWh, final

Capacity factor, 2025

59.4%

2024: 77.7%

January to July 2026

4.63 GWh

Provisional

Range, 2016 to 2025

2.1–8.2

GWh a year. Low 2017, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200111,687Not reported12 of 12
20029,320Not reported12 of 12
2003Not reportedNot reported0 of 12
20049,722Not reported12 of 12
20058,385Not reported12 of 12
200610,264Not reported12 of 12
200710,098Not reported12 of 12
20087,329Not reported12 of 12
20094,847Not reported12 of 12
201000.0%12 of 12
201100.0%12 of 12
201200.0%12 of 12
201379Not reported12 of 12
20140Not reported6 of 12
20150Not reported2 of 12
20164,49642.7%12 of 12
20172,14220.4%12 of 12
20184,41042.0%12 of 12
20194,15139.5%12 of 12
20207,09467.3%12 of 12
20217,59572.3%12 of 12
20226,26759.6%12 of 12
20235,65153.8%12 of 12
20248,19577.7%12 of 12
20256,24259.4%12 of 12
2026 (provisional, partial year)4,63075.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1ANatural Gas Internal Combustion Engine1.2November 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Palm Springs, City of - (CA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Municipal Cogen Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Municipal Cogen Plant

Questions about Municipal Cogen Plant

How much power does Municipal Cogen Plant produce?

Municipal Cogen Plant reported 6,242 MWh (6.24 GWh) of net generation in 2025, a 59.4% capacity factor on 1.2 MW of nameplate capacity. From January to July 2026 it reported 4.63 GWh, which is provisional.

Where is Municipal Cogen Plant?

Municipal Cogen Plant is in Riverside County, California, at 33.8247, −116.5106. It is in the California Independent System Operator balancing area (CISO).

Who operates Municipal Cogen Plant?

EIA-860M for August 2026 lists Palm Springs, City of - (CA) as the operator (EIA operator ID 14395). The operator is not always the owner.

When did Municipal Cogen Plant start operating?

Its first generator began operating in November 2015, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page