WindOperatingCAISO

Edom Hills Project 1 LLC

Wind power plant in Riverside County, California. 20 MW of nameplate capacity across 1 generator, operated by Edom Hills Project 1 LLC.

Also known as Edom Hills Project 1 · Edom Hills (repower) · EIA plant 50553

Analyst: free account, 1 question a day.

Palm Springs DAC PVEast Winds ProjectDesert Hot Springs SolarMountain View IVEdom Hills Project 15 km
Open in the map
6 plants within 8.5 km, from EIA coordinates.

Key facts

Capacity
20 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2008First generator online
Operator
Edom Hills Project 1 LLCEIA operator ID 65490
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Riverside County, CA33.8817, −116.4603
EIA plant ID
50553EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Edom Hills Project 1 produces

Free · EIA-923

Net generation, 2025

1.56 GWh

1,557 MWh, final

Capacity factor, 2025

0.9%

2024: 6.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.6–45.0

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200114,851Not reported12 of 12
200217,462Not reported12 of 12
200313,560Not reported12 of 12
200412,787Not reported12 of 12
200514,087Not reported12 of 12
200612,550Not reported12 of 12
20073,396Not reported12 of 12
20085,619Not reported12 of 12
200931,641Not reported12 of 12
201048,04826.0%12 of 12
201152,16828.2%12 of 12
201244,66524.1%12 of 12
201346,68825.3%12 of 12
201446,637Not reported12 of 12
201543,20024.7%12 of 12
201644,98725.6%12 of 12
201743,82725.0%12 of 12
201837,61821.5%12 of 12
201928,50016.3%12 of 12
202029,64016.9%12 of 12
202125,66614.6%12 of 12
20226,8783.9%12 of 12
202310,7876.2%12 of 12
202412,1816.9%12 of 12
20251,5570.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine20.0September 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Edom Hills Project 1 LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Edom Hills Project 1 LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Edom Hills Project 1

Questions about Edom Hills Project 1

How much power does Edom Hills Project 1 LLC produce?

Edom Hills Project 1 LLC reported 1,557 MWh (1.56 GWh) of net generation in 2025, a 0.9% capacity factor on 20 MW of nameplate capacity.

Where is Edom Hills Project 1 LLC?

Edom Hills Project 1 LLC is in Riverside County, California, at 33.8817, −116.4603. It is in the California Independent System Operator balancing area (CISO).

Who operates Edom Hills Project 1 LLC?

EIA-860M for August 2026 lists Edom Hills Project 1 LLC as the operator (EIA operator ID 65490). The operator is not always the owner.

When did Edom Hills Project 1 LLC start operating?

Its first generator began operating in September 2008, according to EIA-860M.

Does InfraMap have power prices for Edom Hills Project 1 LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Edom Hills Project 1 LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page