Natural gasOperatingBANC

Sutter Energy Center

Natural gas power plant in Sutter County, California. 636 MW of nameplate capacity across 3 generators, operated by Calpine Corp-Sutter.

Also known as EIA plant 55112

Analyst: free account, 1 question a day.

Feather River Energy CenterGreenleaf 2 Power PlantYuba City Cogen PartnersTierra Buena Energy StorageSutter5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
636 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 2001First generator online
Operator
Calpine Corp-SutterEIA operator ID 22650
Grid
BANCBalancing authority BANC
Price nodes
None linkedNo verified ISO node
Location
Sutter County, CA39.0531, −121.6959
EIA plant ID
55112EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sutter produces

Free · EIA-923

Net generation, 2025

1.78 TWh

1,775,995 MWh, final

Capacity factor, 2025

31.9%

2024: 28.6%

January to July 2026

702 GWh

Provisional

Range, 2015 to 2025

0.0–2.6

TWh a year. Low 2017, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20023,699,325Not reported12 of 12
20033,183,607Not reported12 of 12
20043,310,725Not reported12 of 12
20052,429,452Not reported12 of 12
20062,103,327Not reported12 of 12
20072,668,953Not reported12 of 12
20082,898,969Not reported12 of 12
20092,315,457Not reported12 of 12
20101,820,44132.7%12 of 12
2011952,80517.1%12 of 12
20121,273,92022.8%12 of 12
20131,042,203Not reported12 of 12
20141,183,72121.2%12 of 12
20151,253,54622.5%12 of 12
20161200.0%12 of 12
201700.0%12 of 12
2018589,51710.6%12 of 12
2019653,07311.7%12 of 12
2020902,44316.2%12 of 12
20211,838,61633.0%12 of 12
20222,633,37547.3%12 of 12
20232,135,12238.3%12 of 12
20241,598,50228.6%12 of 12
20251,775,99531.9%12 of 12
2026 (provisional, partial year)701,94221.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

776,767

US short tons. 2024: 703,963

SO₂, 2025

4

US short tons

NOx, 2025

58

US short tons

CO₂ per MWh, calculated

0.44 t

About 875 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CT01, CT02), matched to EIA plant 55112 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

High · 0.741

USGS SUI, HUC12 Gilsizer Slough-Snake River

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT01Natural Gas Fired Combined Cycle212.0July 2001
CT02Natural Gas Fired Combined Cycle212.0July 2001
ST01Natural Gas Fired Combined Cycle212.0July 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Calpine Corp-Sutter as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sutter Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sutter

Questions about Sutter

How much power does Sutter Energy Center produce?

Sutter Energy Center reported 1,775,995 MWh (1.78 TWh) of net generation in 2025, a 31.9% capacity factor on 636 MW of nameplate capacity. From January to July 2026 it reported 702 GWh, which is provisional.

Where is Sutter Energy Center?

Sutter Energy Center is in Sutter County, California, at 39.0531, −121.6959. It is in the Balancing Authority of Northern California balancing area (BANC).

Who operates Sutter Energy Center?

EIA-860M for August 2026 lists Calpine Corp-Sutter as the operator (EIA operator ID 22650). The operator is not always the owner.

When did Sutter Energy Center start operating?

Its first generator began operating in July 2001, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page