Natural gasOperatingCAISO

CalPeak Power Panoche Peaker Plant

Natural gas power plant in Fresno County, California. 60.5 MW of nameplate capacity across 1 generator, operated by CalPeak Power, LLC.

Also known as EIA plant 55508

Analyst: free account, 1 question a day.

Conflitti SolarFirebaugh-CCS-PV-1CalPeak Power Panoche…5 km
Open in the map
5 plants within 9.5 km, from EIA coordinates.

Key facts

Capacity
60.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2001First generator online
Operator
CalPeak Power, LLCEIA operator ID 59527
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Fresno County, CA36.6529, −120.5806
EIA plant ID
55508EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power CalPeak Power Panoche Peaker Plant produces

Free · EIA-923

Net generation, 2025

1.87 GWh

1,871 MWh, final

Capacity factor, 2025

0.4%

2024: 2.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.9–38.5

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20010Not reported4 of 12
200221,908Not reported12 of 12
20034,333Not reported12 of 12
20044,448Not reported12 of 12
20054,008Not reported12 of 12
20069,861Not reported12 of 12
200711,729Not reported12 of 12
20086,994Not reported12 of 12
200911,125Not reported12 of 12
20105,1941.2%12 of 12
201112,8593.0%12 of 12
20129,0402.1%12 of 12
20137,8711.8%12 of 12
201413,997Not reported12 of 12
201538,4547.3%12 of 12
201617,9413.4%12 of 12
201715,5712.9%12 of 12
201814,2152.7%12 of 12
20196,6271.3%12 of 12
202019,0153.6%12 of 12
202116,4973.1%12 of 12
20227,1831.4%12 of 12
202326,4155.0%12 of 12
202410,4982.0%12 of 12
20251,8710.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1,218

US short tons. 2024: 6,786

SO₂, 2025

0

US short tons

NOx, 2025

0

US short tons

CO₂ per MWh, calculated

0.65 t

About 1,302 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (GT-1), matched to EIA plant 55508 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CPP2Natural Gas Fired Combustion Turbine60.5December 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CalPeak Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query CalPeak Power Panoche Peaker Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near CalPeak Power Panoche Peaker Plant

More plants operated by CalPeak Power, LLC

Questions about CalPeak Power Panoche Peaker Plant

How much power does CalPeak Power Panoche Peaker Plant produce?

CalPeak Power Panoche Peaker Plant reported 1,871 MWh (1.87 GWh) of net generation in 2025, a 0.4% capacity factor on 60.5 MW of nameplate capacity.

Where is CalPeak Power Panoche Peaker Plant?

CalPeak Power Panoche Peaker Plant is in Fresno County, California, at 36.6529, −120.5806. It is in the California Independent System Operator balancing area (CISO).

Who operates CalPeak Power Panoche Peaker Plant?

EIA-860M for August 2026 lists CalPeak Power, LLC as the operator (EIA operator ID 59527). The operator is not always the owner.

When did CalPeak Power Panoche Peaker Plant start operating?

Its first generator began operating in December 2001, according to EIA-860M.

Does InfraMap have power prices for CalPeak Power Panoche Peaker Plant?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to CalPeak Power Panoche Peaker Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page