Natural gasBattery storageOperatingCAISO

Border Hybrid Energy Center

Natural gas and battery storage project in San Diego County, California. 114.6 MW of nameplate capacity across 2 generators, operated by CalPeak Power, LLC.

Also known as CalPeak Border Power Plant · EIA plant 55510

This project groups Border Hybrid Energy Center (EIA 55510). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Larkspur Energy FacilityAmazon SAN3 Solar ProjectAmazon - SAN5Richard J Donovan Correctional FacilityPio Pico Energy CenterBorder Hybrid1 km
Open in the map
6 plants within 3.2 km, from EIA coordinates.

Key facts

Capacity
114.6 MWNatural gas 60.5 · Battery storage 54.1
Generators
2 operatingEIA-860M, August 2026
Operating since
November 2001First generator online
Operator
CalPeak Power, LLCEIA operator ID 59527
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Diego County, CA32.5624, −116.9439
EIA plant ID
55510EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Border Hybrid produces

Free · EIA-923

Net generation, 2025

9.10 GWh

9,104 MWh, final

Capacity factor, 2025

Not reported

2024: 2.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

8.9–28.0

GWh a year. Low 2019, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20010Not reported4 of 12
200232,314Not reported12 of 12
200311,587Not reported12 of 12
20049,604Not reported12 of 12
20058,049Not reported12 of 12
20066,218Not reported12 of 12
200725,370Not reported12 of 12
200814,732Not reported12 of 12
200918,186Not reported12 of 12
201012,0672.8%12 of 12
201128,8216.6%12 of 12
201216,6523.8%12 of 12
20138,6012.0%12 of 12
201416,042Not reported12 of 12
201513,4232.5%12 of 12
201611,4042.1%12 of 12
201712,3312.3%12 of 12
201811,3812.1%12 of 12
20198,8921.7%12 of 12
202016,6253.1%12 of 12
202128,0225.3%12 of 12
202217,8293.4%12 of 12
202313,2362.5%12 of 12
202414,8042.8%12 of 12
20259,104Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

5,992

US short tons. 2024: 9,699

SO₂, 2025

0

US short tons

NOx, 2025

1

US short tons

CO₂ per MWh, calculated

0.66 t

About 1,316 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (GT-1), matched to EIA plant 55510 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CPP4Natural Gas Fired Combustion Turbine60.5November 2001
HERBatteries54.1November 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CalPeak Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Border Hybrid Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Border Hybrid

More plants operated by CalPeak Power, LLC

Questions about Border Hybrid

How much power does Border Hybrid Energy Center produce?

Border Hybrid Energy Center reported 9,104 MWh (9.10 GWh) of net generation in 2025.

Where is Border Hybrid Energy Center?

Border Hybrid Energy Center is in San Diego County, California, at 32.5624, −116.9439. It is in the California Independent System Operator balancing area (CISO).

Who operates Border Hybrid Energy Center?

EIA-860M for August 2026 lists CalPeak Power, LLC as the operator (EIA operator ID 59527). The operator is not always the owner.

Is Border Hybrid Energy Center a natural gas or a battery storage plant?

Both. Natural gas capacity totals 60.5 MW and battery storage capacity totals 54.1 MW.

When did Border Hybrid Energy Center start operating?

Its first generator began operating in November 2001, according to EIA-860M.

Does InfraMap have power prices for Border Hybrid Energy Center?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Border Hybrid Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page