Natural gasOperatingCAISO

Wellhead Power Panoche

Natural gas power plant in Fresno County, California. 56.7 MW of nameplate capacity across 1 generator, operated by Wellhead Services, Inc.

Also known as Panoche Peaker · EIA plant 55874

Analyst: free account, 1 question a day.

Panoche Energy CenterConflitti SolarFirebaugh-CCS-PV-1Wellhead Power Panoche5 km
Open in the map
5 plants within 9.5 km, from EIA coordinates.

Key facts

Capacity
56.7 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 1973First generator online
Operator
Wellhead Services, IncEIA operator ID 20323
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Fresno County, CA36.6535, −120.5783
EIA plant ID
55874EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Wellhead Power Panoche produces

Free · EIA-923

Net generation, 2025

6.79 GWh

6,788 MWh, final

Capacity factor, 2025

1.4%

2024: 0.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.6–13.2

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
200211,071Not reported12 of 12
20034,027Not reported10 of 12
20042,042Not reported12 of 12
20053,992Not reported12 of 12
20067,726Not reported12 of 12
20079,096Not reported12 of 12
20082,659Not reported12 of 12
20094,780Not reported12 of 12
20102,7320.6%12 of 12
20113,8510.9%12 of 12
20123,3110.8%12 of 12
20134,2301.0%12 of 12
20144,4521.0%12 of 12
20159,9262.3%12 of 12
20168,1351.9%12 of 12
201713,2453.0%12 of 12
201811,2982.6%12 of 12
20192,3070.5%12 of 12
20203,826Not reported12 of 12
20213,2270.6%12 of 12
20222,1510.4%12 of 12
20231,5780.3%12 of 12
20243,3080.7%12 of 12
20256,7881.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
8Natural Gas Fired Combustion Turbine56.7August 1973

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wellhead Services, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Wellhead Power Panoche and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Wellhead Power Panoche

More plants operated by Wellhead Services, Inc

Questions about Wellhead Power Panoche

How much power does Wellhead Power Panoche produce?

Wellhead Power Panoche reported 6,788 MWh (6.79 GWh) of net generation in 2025, a 1.4% capacity factor on 56.7 MW of nameplate capacity.

Where is Wellhead Power Panoche?

Wellhead Power Panoche is in Fresno County, California, at 36.6535, −120.5783. It is in the California Independent System Operator balancing area (CISO).

Who operates Wellhead Power Panoche?

EIA-860M for August 2026 lists Wellhead Services, Inc as the operator (EIA operator ID 20323). The operator is not always the owner.

When did Wellhead Power Panoche start operating?

Its first generator began operating in August 1973, according to EIA-860M.

Does InfraMap have power prices for Wellhead Power Panoche?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Wellhead Power Panoche, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page