Natural gasBattery storageOperatingCAISO

Stanton Energy Reliability Center Hybrid

Natural gas project in Orange County, California. 161 MW of nameplate capacity across 4 generators, operated by Wellhead Services, Inc.

Also known as EIA plant 60698

This project groups Stanton Energy Reliability Center Hybrid (EIA 60698). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

BCE Los Alamitos 2AT&T AnaheimBCE Los Alamitos 1Stanton Energy Reliab…2 km
Open in the map
6 plants within 7.5 km, from EIA coordinates.

Key facts

Capacity
161 MWNatural gas 141.0 · Battery storage 20.0
Generators
4 operatingEIA-860M, August 2026
Operating since
July 2020First generator online
Operator
Wellhead Services, IncEIA operator ID 20323
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
Orange County, CA33.8068, −117.9858
EIA plant ID
60698EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Stanton Energy Reliability Center Hybrid produces

Free · EIA-923

Net generation, 2025

1.65 GWh

1,650 MWh, final

Capacity factor, 2025

0.2%

2024: 0.2%

January to July 2026

1.97 GWh

Provisional

Range, 2021 to 2025

1.1–3.4

GWh a year. Low 2022, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202020,837Not reported5 of 12
20213,3710.4%12 of 12
20221,1450.2%12 of 12
20232,2520.2%12 of 12
20242,1320.2%12 of 12
20251,6500.2%12 of 12
2026 (provisional, partial year)1,9670.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1,344

US short tons. 2024: 1,669

SO₂, 2025

0

US short tons

NOx, 2025

0

US short tons

CO₂ per MWh, calculated

0.81 t

About 1,629 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (D1, D7), matched to EIA plant 60698 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BESS1Batteries10.0August 2020
BESS2Batteries10.0August 2020
GT1Natural Gas Fired Combustion Turbine70.5July 2020
GT2Natural Gas Fired Combustion Turbine70.5July 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wellhead Services, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Stanton Energy Reliability Center Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Stanton Energy Reliability Center Hybrid

More plants operated by Wellhead Services, Inc

Questions about Stanton Energy Reliability Center Hybrid

How much power does Stanton Energy Reliability Center Hybrid produce?

Stanton Energy Reliability Center Hybrid reported 1,650 MWh (1.65 GWh) of net generation in 2025, a 0.2% capacity factor on 161 MW of nameplate capacity. From January to July 2026 it reported 1.97 GWh, which is provisional.

Where is Stanton Energy Reliability Center Hybrid?

Stanton Energy Reliability Center Hybrid is in Orange County, California, at 33.8068, −117.9858. It is in the California Independent System Operator balancing area (CISO).

Who operates Stanton Energy Reliability Center Hybrid?

EIA-860M for August 2026 lists Wellhead Services, Inc as the operator (EIA operator ID 20323). The operator is not always the owner.

When did Stanton Energy Reliability Center Hybrid start operating?

Its first generator began operating in July 2020, according to EIA-860M.

Does InfraMap have power prices for Stanton Energy Reliability Center Hybrid?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Stanton Energy Reliability Center Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page