SolarBattery storageOperatingCAISO

BCE Los Alamitos 1

Solar and battery storage project in Orange County, California. 20 MW of nameplate capacity across 2 generators, operated by Bright Canyon Energy.

Also known as EIA plant 66533

This project groups BCE Los Alamitos 1 (EIA 66533). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

BCE Los Alamitos 2AES ES Alamitos, LLCCSU Long BeachBCE Los Alamitos 12 km
Open in the map
6 plants within 4.2 km, from EIA coordinates.

Key facts

Capacity
20 MWSolar 10.0 · Battery storage 10.0
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2023First generator online
Operator
Bright Canyon EnergyEIA operator ID 65534
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Orange County, CA33.7899, −118.0639
EIA plant ID
66533EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power BCE Los Alamitos 1 produces

Free · EIA-923

Net generation, 2025

Not reported

Not reported MWh, final. 0 of 12 months reported

Capacity factor, 2025

Not reported

2024: 22.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2023 to 2024

3.6–19.1

GWh a year. Low 2023, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
20233,616Not reported12 of 12
202419,12722.6%12 of 12
2025Not reportedNot reported0 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BCE11Solar Photovoltaic10.0August 2023
BCE12Batteries10.0August 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bright Canyon Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query BCE Los Alamitos 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near BCE Los Alamitos 1

More plants operated by Bright Canyon Energy

Questions about BCE Los Alamitos 1

Where is BCE Los Alamitos 1?

BCE Los Alamitos 1 is in Orange County, California, at 33.7899, −118.0639. It is in the California Independent System Operator balancing area (CISO).

Who operates BCE Los Alamitos 1?

EIA-860M for August 2026 lists Bright Canyon Energy as the operator (EIA operator ID 65534). The operator is not always the owner.

Is BCE Los Alamitos 1 a solar or a battery storage plant?

Both. Solar capacity totals 10 MW and battery storage capacity totals 10 MW.

When did BCE Los Alamitos 1 start operating?

Its first generator began operating in August 2023, according to EIA-860M.

Does InfraMap have power prices for BCE Los Alamitos 1?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to BCE Los Alamitos 1, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page