Natural gasOperatingCAISO

AES Alamitos LLC

Natural gas power plant in Los Angeles County, California. 1,115 MW of nameplate capacity across 3 generators, operated by AES Alamitos LLC.

Also known as EIA plant 315

Analyst: free account, 1 question a day.

AES Alamitos Energy CenterHaynesCSU Long BeachCSU Long Beach Lots 7 & 14AES Alamitos1 km
Open in the map
6 plants within 1.8 km, from EIA coordinates.

Key facts

Capacity
1,115 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
December 1961First generator online
Operator
AES Alamitos LLCEIA operator ID 22148
Grid
CAISOBalancing authority CISO
Price nodes
3 CAISO nodesResource nodes with prices
Location
Los Angeles County, CA33.7688, −118.1009
EIA plant ID
315EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power AES Alamitos produces

Free · EIA-923

Net generation, 2025

28.2 GWh

28,213 MWh, final

Capacity factor, 2025

0.3%

2024: 0.3%

January to July 2026

6.02 GWh

Provisional

Range, 2015 to 2025

0.0–1.1

TWh a year. Low 2025, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,323,415Not reported12 of 12
20017,901,896Not reported11 of 12
20024,101,417Not reported12 of 12
20033,078,131Not reported11 of 12
20042,954,395Not reported12 of 12
20051,311,102Not reported12 of 12
20061,792,357Not reported12 of 12
20071,476,333Not reported12 of 12
20082,534,359Not reported12 of 12
20091,718,183Not reported12 of 12
2010881,3905.2%12 of 12
20111,025,3576.1%12 of 12
20121,464,7478.7%12 of 12
20131,528,9319.1%12 of 12
20141,369,7228.1%12 of 12
20151,052,8256.3%12 of 12
2016889,3955.3%12 of 12
2017855,0835.1%12 of 12
2018958,3005.7%12 of 12
2019581,118Not reported12 of 12
2020544,2785.6%12 of 12
2021536,8455.5%12 of 12
2022630,4756.5%12 of 12
2023598,2546.1%12 of 12
202433,9850.3%12 of 12
202528,2130.3%12 of 12
2026 (provisional, partial year)6,0240.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

26,019

US short tons. 2024: 32,687

SO₂, 2025

0

US short tons

NOx, 2025

4

US short tons

CO₂ per MWh, calculated

0.92 t

About 1,844 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6), matched to EIA plant 315 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

18,784

million gallons

Consumption, 2024

0

million gallons

Source

Los Cerritos Channel

Surface, Saline. Once-through

Watershed stress

High · 0.799

USGS SUI, HUC12 Alamitos Bay

36 of 36 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3Natural Gas Steam Turbine310.0December 1961
4Natural Gas Steam Turbine310.0June 1962
5Natural Gas Steam Turbine495.0March 1964

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists AES Alamitos LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query AES Alamitos LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near AES Alamitos

Questions about AES Alamitos

How much power does AES Alamitos LLC produce?

AES Alamitos LLC reported 28,213 MWh (28.2 GWh) of net generation in 2025, a 0.3% capacity factor on 1,115 MW of nameplate capacity. From January to July 2026 it reported 6.02 GWh, which is provisional.

Where is AES Alamitos LLC?

AES Alamitos LLC is in Los Angeles County, California, at 33.7688, −118.1009. It is in the California Independent System Operator balancing area (CISO).

Who operates AES Alamitos LLC?

EIA-860M for August 2026 lists AES Alamitos LLC as the operator (EIA operator ID 22148). The operator is not always the owner.

When did AES Alamitos LLC start operating?

Its first generator began operating in December 1961, according to EIA-860M.

Does InfraMap have power prices for AES Alamitos LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 3 price nodes linked to AES Alamitos LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page