Natural gasOperatingCAISO

AES Alamitos Energy Center

Natural gas power plant in Los Angeles County, California. 678 MW of nameplate capacity across 3 generators, operated by AES Alamitos Energy, LLC.

Also known as EIA plant 62115

Analyst: free account, 1 question a day.

AES Alamitos LLCHaynesAES ES Alamitos, LLCCSU Long Beach Lots 7 & 14CSU Long BeachAES Alamitos1 km
Open in the map
6 plants within 2.0 km, from EIA coordinates.

Key facts

Capacity
678 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
February 2020First generator online
Operator
AES Alamitos Energy, LLCEIA operator ID 61669
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Los Angeles County, CA33.7672, −118.1002
EIA plant ID
62115EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power AES Alamitos produces

Free · EIA-923

Net generation, 2025

1.48 TWh

1,480,462 MWh, final

Capacity factor, 2025

24.9%

2024: 40.3%

January to July 2026

464 GWh

Provisional

Range, 2021 to 2025

1.5–3.5

TWh a year. Low 2025, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
20201,233,825Not reported11 of 12
20212,930,11449.3%12 of 12
20223,451,86258.1%12 of 12
20232,704,03345.5%12 of 12
20242,397,91440.3%12 of 12
20251,480,46224.9%12 of 12
2026 (provisional, partial year)464,48613.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

High · 0.799

USGS SUI, HUC12 Alamitos Bay

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1ANatural Gas Fired Combined Cycle231.0February 2020
1BNatural Gas Fired Combined Cycle231.0February 2020
1SNatural Gas Fired Combined Cycle216.0February 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists AES Alamitos Energy, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query AES Alamitos Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near AES Alamitos

Questions about AES Alamitos

How much power does AES Alamitos Energy Center produce?

AES Alamitos Energy Center reported 1,480,462 MWh (1.48 TWh) of net generation in 2025, a 24.9% capacity factor on 678 MW of nameplate capacity. From January to July 2026 it reported 464 GWh, which is provisional.

Where is AES Alamitos Energy Center?

AES Alamitos Energy Center is in Los Angeles County, California, at 33.7672, −118.1002. It is in the California Independent System Operator balancing area (CISO).

Who operates AES Alamitos Energy Center?

EIA-860M for August 2026 lists AES Alamitos Energy, LLC as the operator (EIA operator ID 61669). The operator is not always the owner.

When did AES Alamitos Energy Center start operating?

Its first generator began operating in February 2020, according to EIA-860M.

Does InfraMap have power prices for AES Alamitos Energy Center?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to AES Alamitos Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page