Natural gasOperatingLDWP

Haynes

Natural gas power plant in Los Angeles County, California. 1,739.1 MW of nameplate capacity across 11 generators, operated by Los Angeles Department of Water & Power.

Also known as Haynes Generating Station · EIA plant 400

Analyst: free account, 1 question a day.

AES Alamitos LLCCSU Long Beach Lots 7 & 14CSU Long BeachHaynes1 km
Open in the map
6 plants within 2.3 km, from EIA coordinates.

Key facts

Capacity
1,739.1 MWNameplate
Generators
11 operatingEIA-860M, August 2026
Operating since
September 1962First generator online
Operator
Los Angeles Department of Water & PowerEIA operator ID 11208
Grid
LDWPBalancing authority LDWP
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA33.7647, −118.0991
EIA plant ID
400EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Haynes produces

Free · EIA-923

Net generation, 2025

1.65 TWh

1,652,416 MWh, final

Capacity factor, 2025

10.8%

2024: 16.5%

January to July 2026

686 GWh

Provisional

Range, 2015 to 2025

1.7–3.7

TWh a year. Low 2025, high 2020

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20003,568,531Not reported12 of 12
20013,315,253Not reported12 of 12
20022,328,262Not reported12 of 12
20032,484,718Not reported12 of 12
20042,046,335Not reported12 of 12
20053,648,482Not reported12 of 12
20063,481,806Not reported12 of 12
20074,003,233Not reported12 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
20152,878,54418.9%12 of 12
20163,368,11022.0%12 of 12
20172,853,92118.7%12 of 12
20182,865,24120.6%11 of 12
20192,926,94419.2%12 of 12
20203,680,12224.1%12 of 12
20212,602,48717.1%12 of 12
20222,562,64116.8%12 of 12
20232,549,66716.7%12 of 12
20242,526,44416.5%12 of 12
20251,652,41610.8%12 of 12
2026 (provisional, partial year)686,2347.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

747,784

US short tons. 2024: 1.12M

SO₂, 2025

4

US short tons

NOx, 2025

46

US short tons

CO₂ per MWh, calculated

0.45 t

About 905 lb per MWh

10 of 10 EPA units reported CO₂ in 2025 (1, 10, 11, 12, 13, 14, 15, 16, and others), matched to EIA plant 400 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

126,038

million gallons

Consumption, 2024

Not reported

million gallons

Source

Pacific Ocean

Other, Other. Once-through

Watershed stress

High · 0.799

USGS SUI, HUC12 Alamitos Bay

36 of 36 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine230.0September 1962
2Natural Gas Steam Turbine230.0April 1963
8Natural Gas Fired Combined Cycle264.3January 2005
9Natural Gas Fired Combined Cycle182.8January 2005
10Natural Gas Fired Combined Cycle182.8January 2005
11Natural Gas Fired Combustion Turbine108.2June 2013
12Natural Gas Fired Combustion Turbine108.2June 2013
13Natural Gas Fired Combustion Turbine108.2June 2013
14Natural Gas Fired Combustion Turbine108.2June 2013
15Natural Gas Fired Combustion Turbine108.2June 2013
16Natural Gas Fired Combustion Turbine108.2June 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Los Angeles Department of Water & Power as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Haynes and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Haynes

More plants operated by Los Angeles Department of Water & Power

Questions about Haynes

How much power does Haynes produce?

Haynes reported 1,652,416 MWh (1.65 TWh) of net generation in 2025, a 10.8% capacity factor on 1,739.1 MW of nameplate capacity. From January to July 2026 it reported 686 GWh, which is provisional.

Where is Haynes?

Haynes is in Los Angeles County, California, at 33.7647, −118.0991. It is in the Los Angeles Department of Water and Power balancing area (LDWP).

Who operates Haynes?

EIA-860M for August 2026 lists Los Angeles Department of Water & Power as the operator (EIA operator ID 11208). The operator is not always the owner.

When did Haynes start operating?

Its first generator began operating in September 1962, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page