CSU Long Beach
Battery storage project in Los Angeles County, California. 2.5 MW of nameplate capacity across 1 generator, operated by Hybrid-Electric Building Technologies West Los Angeles 1, LLC.
Also known as EIA plant 63611
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 2.5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- March 2017First generator online
- Operator
- Hybrid-Electric Building Technologies West Los Angeles 1, LLCEIA operator ID 63785
- Grid
- CAISOBalancing authority CISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Los Angeles County, CA33.7838, −118.1080
- EIA plant ID
- 63611EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power CSU Long Beach produces
Free · EIA-923Net generation, 2025
−547 MWh
−547 MWh, final
Battery discharge, 2025
2.18 GWh
Charge 2.73 GWh
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2020 to 2025
−547.0–−203.0
MWh a year. Low 2025, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | −297 | Not reported | 12 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | −203 | Not reported | 12 of 12 |
| 2025 | −547 | Not reported | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Battery plants can report negative net generation, when charging uses more energy than they discharge.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CSULB | Batteries | 2.5 | March 2017 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hybrid-Electric Building Technologies West Los Angeles 1, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query CSU Long Beach and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near CSU Long Beach
More plants operated by Hybrid-Electric Building Technologies West Los Angeles 1, LLC
Questions about CSU Long Beach
How much power does CSU Long Beach produce?
CSU Long Beach reported −547 MWh (−547 MWh) of net generation in 2025.
Where is CSU Long Beach?
CSU Long Beach is in Los Angeles County, California, at 33.7838, −118.1080. It is in the California Independent System Operator balancing area (CISO).
Who operates CSU Long Beach?
EIA-860M for August 2026 lists Hybrid-Electric Building Technologies West Los Angeles 1, LLC as the operator (EIA operator ID 63785). The operator is not always the owner.
When did CSU Long Beach start operating?
Its first generator began operating in March 2017, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page