Pine Tree Wind Power Project
Wind power plant in Kern County, California. 135 MW of nameplate capacity across 1 generator, operated by Los Angeles Department of Water & Power.
Also known as Pine Tree Wind Farm · Pine Tree extension · EIA plant 56433
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 135 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- June 2009First generator online
- Operator
- Los Angeles Department of Water & PowerEIA operator ID 11208
- Grid
- LDWPBalancing authority LDWP
- Price nodes
- None linkedNo verified ISO node
- Location
- Kern County, CA35.2480, −118.1754
- EIA plant ID
- 56433EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Pine Tree Wind Power Project produces
Free · EIA-923Net generation, 2025
123 GWh
123,003 MWh, final
Capacity factor, 2025
10.4%
2024: 9.7%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
61.0–285.3
GWh a year. Low 2023, high 2018
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | 135,173 | Not reported | 7 of 12 |
| 2010 | 306,709 | Not reported | 12 of 12 |
| 2011 | 286,120 | 24.2% | 12 of 12 |
| 2012 | 281,975 | 23.8% | 12 of 12 |
| 2013 | 273,943 | 23.2% | 12 of 12 |
| 2014 | 283,265 | 24.0% | 12 of 12 |
| 2015 | 122,352 | 10.3% | 12 of 12 |
| 2016 | 141,609 | 11.9% | 12 of 12 |
| 2017 | 256,088 | 21.7% | 12 of 12 |
| 2018 | 285,293 | 24.1% | 12 of 12 |
| 2019 | 257,823 | 21.8% | 12 of 12 |
| 2020 | 260,357 | 22.0% | 12 of 12 |
| 2021 | 215,703 | 18.2% | 12 of 12 |
| 2022 | 123,185 | 10.4% | 12 of 12 |
| 2023 | 61,007 | 5.2% | 12 of 12 |
| 2024 | 115,402 | 9.7% | 12 of 12 |
| 2025 | 123,003 | 10.4% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 135.0 | June 2009 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Los Angeles Department of Water & Power as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Pine Tree Wind Power Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Pine Tree Wind Power Project
More plants operated by Los Angeles Department of Water & Power
Questions about Pine Tree Wind Power Project
How much power does Pine Tree Wind Power Project produce?
Pine Tree Wind Power Project reported 123,003 MWh (123 GWh) of net generation in 2025, a 10.4% capacity factor on 135 MW of nameplate capacity.
Where is Pine Tree Wind Power Project?
Pine Tree Wind Power Project is in Kern County, California, at 35.2480, −118.1754. It is in the Los Angeles Department of Water and Power balancing area (LDWP).
Who operates Pine Tree Wind Power Project?
EIA-860M for August 2026 lists Los Angeles Department of Water & Power as the operator (EIA operator ID 11208). The operator is not always the owner.
When did Pine Tree Wind Power Project start operating?
Its first generator began operating in June 2009, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page