WindOperatingERCOT

NWP Indian Mesa Wind Farm

Wind power plant in Pecos County, Texas. 82.5 MW of nameplate capacity across 1 generator, operated by NWP Indian Mesa Wind Farm LP.

Also known as Indian Mesa Wind Energy Center · Indian Mesa · EIA plant 55747

Analyst: free account, 1 question a day.

RE MaplewoodMidway Solar - TXAlamo 6HydraNWP Indian Mesa Wind Farm5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
82.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 2001First generator online
Operator
NWP Indian Mesa Wind Farm LPEIA operator ID 13866
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Pecos County, TX30.9315, −102.2014
EIA plant ID
55747EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power NWP Indian Mesa Wind Farm produces

Free · EIA-923

Net generation, 2025

178 GWh

178,492 MWh, final

Capacity factor, 2025

24.7%

2024: 28.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

149.9–238.0

GWh a year. Low 2018, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200121,091Not reported1 of 12
2002195,031Not reported12 of 12
2003181,291Not reported12 of 12
2004193,262Not reported12 of 12
2005230,315Not reported12 of 12
2006235,582Not reported12 of 12
2007219,314Not reported12 of 12
2008242,399Not reported12 of 12
2009200,974Not reported12 of 12
2010267,17237.0%12 of 12
2011257,84835.7%12 of 12
2012246,10434.0%12 of 12
2013219,69330.4%12 of 12
2014223,91431.0%12 of 12
2015168,09123.3%12 of 12
2016152,68021.1%12 of 12
2017175,94924.3%12 of 12
2018149,85120.7%12 of 12
2019208,25628.8%12 of 12
2020237,99132.8%12 of 12
2021218,74030.3%12 of 12
2022204,54828.3%12 of 12
2023197,81927.4%12 of 12
2024205,62028.4%12 of 12
2025178,49224.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
NWP2Onshore Wind Turbine82.5May 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NWP Indian Mesa Wind Farm LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query NWP Indian Mesa Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near NWP Indian Mesa Wind Farm

Questions about NWP Indian Mesa Wind Farm

How much power does NWP Indian Mesa Wind Farm produce?

NWP Indian Mesa Wind Farm reported 178,492 MWh (178 GWh) of net generation in 2025, a 24.7% capacity factor on 82.5 MW of nameplate capacity.

Where is NWP Indian Mesa Wind Farm?

NWP Indian Mesa Wind Farm is in Pecos County, Texas, at 30.9315, −102.2014. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates NWP Indian Mesa Wind Farm?

EIA-860M for August 2026 lists NWP Indian Mesa Wind Farm LP as the operator (EIA operator ID 13866). The operator is not always the owner.

When did NWP Indian Mesa Wind Farm start operating?

Its first generator began operating in May 2001, according to EIA-860M.

Does InfraMap have power prices for NWP Indian Mesa Wind Farm?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to NWP Indian Mesa Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page