East Pecos Solar
Solar power plant in Pecos County, Texas. 118.5 MW of nameplate capacity across 1 generator, operated by Southern Power Co.
Also known as EIA plant 60436
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 118.5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2017First generator online
- Operator
- Southern Power CoEIA operator ID 17650
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Pecos County, TX31.0009, −102.2817
- EIA plant ID
- 60436EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power East Pecos Solar produces
Free · EIA-923Net generation, 2025
219 GWh
219,423 MWh, final
Capacity factor, 2025
21.1%
2024: 23.8%
January to July 2026
146 GWh
Provisional
Range, 2018 to 2025
219.4–297.3
GWh a year. Low 2025, high 2020
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | 241,679 | Not reported | 10 of 12 |
| 2018 | 294,444 | 28.4% | 12 of 12 |
| 2019 | 290,989 | 28.0% | 12 of 12 |
| 2020 | 297,310 | 28.6% | 12 of 12 |
| 2021 | 285,454 | 27.5% | 12 of 12 |
| 2022 | 275,630 | 26.6% | 12 of 12 |
| 2023 | 266,984 | 25.7% | 12 of 12 |
| 2024 | 247,424 | 23.8% | 12 of 12 |
| 2025 | 219,423 | 21.1% | 12 of 12 |
| 2026 (provisional, partial year) | 146,218 | 24.3% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Solar Photovoltaic | 118.5 | April 2017 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southern Power Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query East Pecos Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near East Pecos Solar
More plants operated by Southern Power Co
Questions about East Pecos Solar
How much power does East Pecos Solar produce?
East Pecos Solar reported 219,423 MWh (219 GWh) of net generation in 2025, a 21.1% capacity factor on 118.5 MW of nameplate capacity. From January to July 2026 it reported 146 GWh, which is provisional.
Where is East Pecos Solar?
East Pecos Solar is in Pecos County, Texas, at 31.0009, −102.2817. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates East Pecos Solar?
EIA-860M for August 2026 lists Southern Power Co as the operator (EIA operator ID 17650). The operator is not always the owner.
When did East Pecos Solar start operating?
Its first generator began operating in April 2017, according to EIA-860M.
Does InfraMap have power prices for East Pecos Solar?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to East Pecos Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page