Midway Solar - TX
Solar power plant in Pecos County, Texas. 182 MW of nameplate capacity across 1 generator, operated by Midway Solar.
Also known as Midway Solar · Midway Solar-TX · EIA plant 61368
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 182 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2018First generator online
- Operator
- Midway SolarEIA operator ID 61801
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Pecos County, TX30.9955, −102.2235
- EIA plant ID
- 61368EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Midway Solar - TX produces
Free · EIA-923Net generation, 2025
332 GWh
332,466 MWh, final
Capacity factor, 2025
20.9%
2024: 19.8%
January to July 2026
168 GWh
Provisional
Range, 2019 to 2025
280.9–384.4
GWh a year. Low 2022, high 2020
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | 9,399 | Not reported | 1 of 12 |
| 2019 | 333,604 | 20.9% | 12 of 12 |
| 2020 | 384,440 | 24.0% | 12 of 12 |
| 2021 | 354,554 | 22.2% | 12 of 12 |
| 2022 | 280,863 | 17.6% | 12 of 12 |
| 2023 | 287,431 | 18.0% | 12 of 12 |
| 2024 | 316,736 | 19.8% | 12 of 12 |
| 2025 | 332,466 | 20.9% | 12 of 12 |
| 2026 (provisional, partial year) | 167,739 | 18.1% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| PV1 | Solar Photovoltaic | 182.0 | December 2018 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Midway Solar as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Midway Solar - TX and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Midway Solar - TX
Questions about Midway Solar - TX
How much power does Midway Solar - TX produce?
Midway Solar - TX reported 332,466 MWh (332 GWh) of net generation in 2025, a 20.9% capacity factor on 182 MW of nameplate capacity. From January to July 2026 it reported 168 GWh, which is provisional.
Where is Midway Solar - TX?
Midway Solar - TX is in Pecos County, Texas, at 30.9955, −102.2235. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Midway Solar - TX?
EIA-860M for August 2026 lists Midway Solar as the operator (EIA operator ID 61801). The operator is not always the owner.
When did Midway Solar - TX start operating?
Its first generator began operating in December 2018, according to EIA-860M.
Does InfraMap have power prices for Midway Solar - TX?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Midway Solar - TX, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page