Natural gasOperatingPACE

Nebo Power Station

Natural gas power plant in Utah County, Utah. 140 MW of nameplate capacity across 2 generators, operated by Utah Associated Mun Power Sys.

Also known as EIA plant 56177

Analyst: free account, 1 question a day.

Spanish ForkSpanish Fork Community SolarWhiteheadNebo10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
140 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 2004First generator online
Operator
Utah Associated Mun Power SysEIA operator ID 40575
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Utah County, UT40.0614, −111.7294
EIA plant ID
56177EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Nebo produces

Free · EIA-923

Net generation, 2025

769 GWh

768,547 MWh, final

Capacity factor, 2025

62.7%

2024: 65.8%

January to July 2026

332 GWh

Provisional

Range, 2015 to 2025

344.6–825.4

GWh a year. Low 2017, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005275,636Not reported12 of 12
2006400,860Not reported12 of 12
2007681,389Not reported12 of 12
2008504,393Not reported12 of 12
2009466,163Not reported12 of 12
2010445,59536.3%12 of 12
2011339,64727.7%12 of 12
2012423,90134.5%12 of 12
2013391,065Not reported12 of 12
2014358,69029.2%12 of 12
2015483,49539.4%12 of 12
2016534,32943.4%12 of 12
2017344,58828.1%12 of 12
2018433,49035.3%12 of 12
2019419,39434.2%12 of 12
2020466,71138.0%12 of 12
2021543,60944.3%12 of 12
2022389,23131.7%12 of 12
2023825,41267.3%12 of 12
2024809,11565.8%12 of 12
2025768,54762.7%12 of 12
2026 (provisional, partial year)332,08746.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

383,516

US short tons. 2024: 372,635

SO₂, 2025

2

US short tons

NOx, 2025

559

US short tons

CO₂ per MWh, calculated

0.50 t

About 998 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (U1), matched to EIA plant 56177 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Natural Gas Fired Combined Cycle65.0June 2004
ST1Natural Gas Fired Combined Cycle75.0June 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Utah Associated Mun Power Sys as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Nebo Power Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Nebo

More plants operated by Utah Associated Mun Power Sys

Questions about Nebo

How much power does Nebo Power Station produce?

Nebo Power Station reported 768,547 MWh (769 GWh) of net generation in 2025, a 62.7% capacity factor on 140 MW of nameplate capacity. From January to July 2026 it reported 332 GWh, which is provisional.

Where is Nebo Power Station?

Nebo Power Station is in Utah County, Utah, at 40.0614, −111.7294. It is in the PacifiCorp - East balancing area (PACE).

Who operates Nebo Power Station?

EIA-860M for August 2026 lists Utah Associated Mun Power Sys as the operator (EIA operator ID 40575). The operator is not always the owner.

When did Nebo Power Station start operating?

Its first generator began operating in June 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page