- Capacity
- 140 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- June 2004First generator online
- Operator
- Utah Associated Mun Power SysEIA operator ID 40575
- Grid
- PACEBalancing authority PACE
- Price nodes
- None linkedNo verified ISO node
- Location
- Utah County, UT40.0614, −111.7294
- EIA plant ID
- 56177EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Nebo produces
Free · EIA-923Net generation, 2025
769 GWh
768,547 MWh, final
Capacity factor, 2025
62.7%
2024: 65.8%
January to July 2026
332 GWh
Provisional
Range, 2015 to 2025
344.6–825.4
GWh a year. Low 2017, high 2023
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | 275,636 | Not reported | 12 of 12 |
| 2006 | 400,860 | Not reported | 12 of 12 |
| 2007 | 681,389 | Not reported | 12 of 12 |
| 2008 | 504,393 | Not reported | 12 of 12 |
| 2009 | 466,163 | Not reported | 12 of 12 |
| 2010 | 445,595 | 36.3% | 12 of 12 |
| 2011 | 339,647 | 27.7% | 12 of 12 |
| 2012 | 423,901 | 34.5% | 12 of 12 |
| 2013 | 391,065 | Not reported | 12 of 12 |
| 2014 | 358,690 | 29.2% | 12 of 12 |
| 2015 | 483,495 | 39.4% | 12 of 12 |
| 2016 | 534,329 | 43.4% | 12 of 12 |
| 2017 | 344,588 | 28.1% | 12 of 12 |
| 2018 | 433,490 | 35.3% | 12 of 12 |
| 2019 | 419,394 | 34.2% | 12 of 12 |
| 2020 | 466,711 | 38.0% | 12 of 12 |
| 2021 | 543,609 | 44.3% | 12 of 12 |
| 2022 | 389,231 | 31.7% | 12 of 12 |
| 2023 | 825,412 | 67.3% | 12 of 12 |
| 2024 | 809,115 | 65.8% | 12 of 12 |
| 2025 | 768,547 | 62.7% | 12 of 12 |
| 2026 (provisional, partial year) | 332,087 | 46.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDCO₂, 2025
383,516
US short tons. 2024: 372,635
SO₂, 2025
2
US short tons
NOx, 2025
559
US short tons
CO₂ per MWh, calculated
0.50 t
About 998 lb per MWh
1 of 1 EPA units reported CO₂ in 2025 (U1), matched to EIA plant 56177 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GT1 | Natural Gas Fired Combined Cycle | 65.0 | June 2004 |
| ST1 | Natural Gas Fired Combined Cycle | 75.0 | June 2004 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Utah Associated Mun Power Sys as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Nebo Power Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Nebo
More plants operated by Utah Associated Mun Power Sys
Questions about Nebo
How much power does Nebo Power Station produce?
Nebo Power Station reported 768,547 MWh (769 GWh) of net generation in 2025, a 62.7% capacity factor on 140 MW of nameplate capacity. From January to July 2026 it reported 332 GWh, which is provisional.
Where is Nebo Power Station?
Nebo Power Station is in Utah County, Utah, at 40.0614, −111.7294. It is in the PacifiCorp - East balancing area (PACE).
Who operates Nebo Power Station?
EIA-860M for August 2026 lists Utah Associated Mun Power Sys as the operator (EIA operator ID 40575). The operator is not always the owner.
When did Nebo Power Station start operating?
Its first generator began operating in June 2004, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page