Natural gasOperatingPACE

Tesoro SLC Cogeneration Plant

Natural gas power plant in Salt Lake County, Utah. 30.4 MW of nameplate capacity across 2 generators, operated by Tesoro Refng Marketing Co Mntn Region.

Also known as EIA plant 56509

Analyst: free account, 1 question a day.

GadsbyHTW Plant 303 COGENBountiful CitySalt Lake Energy SystemsTesoro SLC Cogenerati…5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
30.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 2004First generator online
Operator
Tesoro Refng Marketing Co Mntn RegionEIA operator ID 54911
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Salt Lake County, UT40.7931, −111.9038
EIA plant ID
56509EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Tesoro SLC Cogeneration Plant produces

Free · EIA-923

Net generation, 2025

199 GWh

198,679 MWh, final

Capacity factor, 2025

74.6%

2024: 69.3%

January to July 2026

117 GWh

Provisional

Range, 2015 to 2025

139.3–202.6

GWh a year. Low 2023, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006175,245Not reported12 of 12
200740,986Not reported12 of 12
2008180,583Not reported12 of 12
2009192,831Not reported12 of 12
2010183,90084.0%12 of 12
2011173,53879.2%12 of 12
2012158,72772.3%12 of 12
2013156,39171.4%12 of 12
2014180,10582.2%12 of 12
2015177,03180.8%12 of 12
2016194,17088.4%12 of 12
2017195,03189.1%12 of 12
2018182,165Not reported12 of 12
2019194,75373.1%12 of 12
2020186,68569.9%12 of 12
2021197,42874.1%12 of 12
2022202,63476.1%12 of 12
2023139,31052.3%12 of 12
2024185,08469.3%12 of 12
2025198,67974.6%12 of 12
2026 (provisional, partial year)117,12775.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine15.2July 2004
2Natural Gas Fired Combustion Turbine15.2July 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tesoro Refng Marketing Co Mntn Region as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Tesoro SLC Cogeneration Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Tesoro SLC Cogeneration Plant

Questions about Tesoro SLC Cogeneration Plant

How much power does Tesoro SLC Cogeneration Plant produce?

Tesoro SLC Cogeneration Plant reported 198,679 MWh (199 GWh) of net generation in 2025, a 74.6% capacity factor on 30.4 MW of nameplate capacity. From January to July 2026 it reported 117 GWh, which is provisional.

Where is Tesoro SLC Cogeneration Plant?

Tesoro SLC Cogeneration Plant is in Salt Lake County, Utah, at 40.7931, −111.9038. It is in the PacifiCorp - East balancing area (PACE).

Who operates Tesoro SLC Cogeneration Plant?

EIA-860M for August 2026 lists Tesoro Refng Marketing Co Mntn Region as the operator (EIA operator ID 54911). The operator is not always the owner.

When did Tesoro SLC Cogeneration Plant start operating?

Its first generator began operating in July 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page