Natural gasOperatingPACE

Gadsby

Natural gas power plant in Salt Lake County, Utah. 432.8 MW of nameplate capacity across 6 generators, operated by PacifiCorp.

Also known as Gadsby Power Plant · EIA plant 3648

Analyst: free account, 1 question a day.

Tesoro SLC Cogeneration PlantSalt Lake Energy SystemsMurray TurbineGadsby5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
432.8 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
September 1951First generator online
Operator
PacifiCorpEIA operator ID 14354
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Salt Lake County, UT40.7686, −111.9289
EIA plant ID
3648EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gadsby produces

Free · EIA-923

Net generation, 2025

230 GWh

229,850 MWh, final

Capacity factor, 2025

6.1%

2024: 9.1%

January to July 2026

102 GWh

Provisional

Range, 2015 to 2025

59.3–345.3

GWh a year. Low 2018, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000718,120Not reported12 of 12
2001955,476Not reported12 of 12
2002655,259Not reported12 of 12
2003539,871Not reported12 of 12
2004325,534Not reported12 of 12
2005198,763Not reported12 of 12
2006344,884Not reported12 of 12
2007633,149Not reported12 of 12
2008Not reportedNot reported0 of 12
2009605,656Not reported12 of 12
2010359,3269.5%12 of 12
2011195,3685.2%12 of 12
2012212,5956.1%11 of 12
2013339,633Not reported12 of 12
2014325,677Not reported12 of 12
2015123,7972.9%12 of 12
2016121,2592.8%12 of 12
201792,8142.2%12 of 12
201859,3101.4%12 of 12
2019134,1823.1%12 of 12
2020133,4103.1%12 of 12
202183,008Not reported12 of 12
2022118,8212.8%12 of 12
2023237,249Not reported12 of 12
2024345,3119.1%12 of 12
2025229,8506.1%12 of 12
2026 (provisional, partial year)102,4344.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

227,934

US short tons. 2024: 335,173

SO₂, 2025

1

US short tons

NOx, 2025

196

US short tons

CO₂ per MWh, calculated

0.99 t

About 1,983 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6), matched to EIA plant 3648 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

345

million gallons

Consumption, 2024

163

million gallons

Source

Jordan River

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.280

USGS SUI, HUC12 Jordan River-Frontal Great Salt Lake

36 of 36 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine69.0September 1951
2Natural Gas Steam Turbine69.0December 1952
3Natural Gas Steam Turbine113.6June 1955
4Natural Gas Fired Combustion Turbine60.4July 2002
5Natural Gas Fired Combustion Turbine60.4July 2002
6Natural Gas Fired Combustion Turbine60.4August 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists PacifiCorp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gadsby and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gadsby

More plants operated by PacifiCorp

Questions about Gadsby

How much power does Gadsby produce?

Gadsby reported 229,850 MWh (230 GWh) of net generation in 2025, a 6.1% capacity factor on 432.8 MW of nameplate capacity. From January to July 2026 it reported 102 GWh, which is provisional.

Where is Gadsby?

Gadsby is in Salt Lake County, Utah, at 40.7686, −111.9289. It is in the PacifiCorp - East balancing area (PACE).

Who operates Gadsby?

EIA-860M for August 2026 lists PacifiCorp as the operator (EIA operator ID 14354). The operator is not always the owner.

When did Gadsby start operating?

Its first generator began operating in September 1951, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page