Key facts

Capacity
9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 2009First generator online
Operator
Kodiak Electric Assn IncEIA operator ID 10433
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
Kodiak Island, AK57.7869, −152.4406
EIA plant ID
57187EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Pillar Mountain Wind Project Microgrid produces

Free · EIA-923

Net generation, 2025

20.5 GWh

20,471 MWh, final

Capacity factor, 2025

26.0%

2024: 33.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

20.5–29.3

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
20096,138Not reported12 of 12
201012,60632.0%12 of 12
201112,44531.6%12 of 12
201216,313Not reported12 of 12
201326,69933.9%12 of 12
201423,32329.6%12 of 12
201529,10736.9%12 of 12
201629,30937.1%12 of 12
201724,15530.6%12 of 12
201826,17033.2%12 of 12
201925,01531.7%12 of 12
202024,68231.2%12 of 12
202125,23832.0%12 of 12
202225,00231.7%12 of 12
202324,07330.5%12 of 12
202426,13533.1%12 of 12
202520,47126.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine4.5June 2009
2Onshore Wind Turbine4.5September 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Kodiak Electric Assn Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Pillar Mountain Wind Project Microgrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Pillar Mountain Wind Project Microgrid

More plants operated by Kodiak Electric Assn Inc

Questions about Pillar Mountain Wind Project Microgrid

How much power does Pillar Mountain Wind Project Microgrid produce?

Pillar Mountain Wind Project Microgrid reported 20,471 MWh (20.5 GWh) of net generation in 2025, a 26.0% capacity factor on 9 MW of nameplate capacity.

Where is Pillar Mountain Wind Project Microgrid?

Pillar Mountain Wind Project Microgrid is in Kodiak Island, Alaska, at 57.7869, −152.4406.

Who operates Pillar Mountain Wind Project Microgrid?

EIA-860M for August 2026 lists Kodiak Electric Assn Inc as the operator (EIA operator ID 10433). The operator is not always the owner.

When did Pillar Mountain Wind Project Microgrid start operating?

Its first generator began operating in June 2009, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page