HydroOperating

Terror Lake Microgrid

Hydro power plant in Kodiak Island, Alaska. 33.6 MW of nameplate capacity across 3 generators, operated by Kodiak Electric Assn Inc.

Also known as Terror Lake Microgrid Power Plant · EIA plant 71

Analyst: free account, 1 question a day.

Port Lions MicrogridNymans Plant MicrogridSwampy Acres MicrogridTerror Lake Microgrid20 km
Open in the map
6 plants within 32 km, from EIA coordinates.

Key facts

Capacity
33.6 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
December 1984First generator online
Operator
Kodiak Electric Assn IncEIA operator ID 10433
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
Kodiak Island, AK57.6861, −152.8950
EIA plant ID
71EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Terror Lake Microgrid produces

Free · EIA-923

Net generation, 2025

147 GWh

147,315 MWh, final

Capacity factor, 2025

50.0%

2024: 45.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

122.0–147.3

GWh a year. Low 2018, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200191,855Not reported12 of 12
2002114,546Not reported12 of 12
2003126,884Not reported12 of 12
2004134,232Not reported12 of 12
2005121,463Not reported12 of 12
20069,648Not reported12 of 12
200791,915Not reported12 of 12
2008120,879Not reported12 of 12
200998,551Not reported12 of 12
2010123,96463.2%12 of 12
2011114,18658.2%12 of 12
2012131,12166.6%12 of 12
2013119,14260.7%12 of 12
2014134,031Not reported12 of 12
2015128,89343.8%12 of 12
2016124,48442.2%12 of 12
2017137,01446.6%12 of 12
2018121,96941.4%12 of 12
2019124,76242.4%12 of 12
2020126,41942.8%12 of 12
2021132,33345.0%12 of 12
2022135,14745.9%12 of 12
2023137,66646.8%12 of 12
2024134,08045.4%12 of 12
2025147,31550.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric11.2December 1984
2Conventional Hydroelectric11.2December 1984
3Conventional Hydroelectric11.2February 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Kodiak Electric Assn Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Terror Lake Microgrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Terror Lake Microgrid

More plants operated by Kodiak Electric Assn Inc

Questions about Terror Lake Microgrid

How much power does Terror Lake Microgrid produce?

Terror Lake Microgrid reported 147,315 MWh (147 GWh) of net generation in 2025, a 50.0% capacity factor on 33.6 MW of nameplate capacity.

Where is Terror Lake Microgrid?

Terror Lake Microgrid is in Kodiak Island, Alaska, at 57.6861, −152.8950.

Who operates Terror Lake Microgrid?

EIA-860M for August 2026 lists Kodiak Electric Assn Inc as the operator (EIA operator ID 10433). The operator is not always the owner.

When did Terror Lake Microgrid start operating?

Its first generator began operating in December 1984, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page