Key facts

Capacity
250 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
November 2013First generator online
Operator
Genesis Solar LLCEIA operator ID 56723
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Riverside County, CA33.6650, −114.9981
EIA plant ID
57394EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Genesis Solar Energy Project produces

Free · EIA-923

Net generation, 2025

608 GWh

607,891 MWh, final

Capacity factor, 2025

27.8%

2024: 28.4%

January to July 2026

374 GWh

Provisional

Range, 2015 to 2025

538.6–627.8

GWh a year. Low 2021, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
20137,029Not reported2 of 12
2014576,113Not reported12 of 12
2015621,45428.4%12 of 12
2016624,14228.4%12 of 12
2017627,83128.7%12 of 12
2018623,14228.5%12 of 12
2019617,04328.2%12 of 12
2020609,12927.7%12 of 12
2021538,60724.6%12 of 12
2022613,70728.0%12 of 12
2023618,18428.2%12 of 12
2024623,69928.4%12 of 12
2025607,89127.8%12 of 12
2026 (provisional, partial year)373,89929.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

Very low/none · 0.192

USGS SUI, HUC12 Ford Dry Lake

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN01Solar Thermal without Energy Storage125.0March 2014
GEN02Solar Thermal without Energy Storage125.0November 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Genesis Solar LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Genesis Solar Energy Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Genesis Solar Energy Project

Questions about Genesis Solar Energy Project

How much power does Genesis Solar Energy Project produce?

Genesis Solar Energy Project reported 607,891 MWh (608 GWh) of net generation in 2025, a 27.8% capacity factor on 250 MW of nameplate capacity. From January to July 2026 it reported 374 GWh, which is provisional.

Where is Genesis Solar Energy Project?

Genesis Solar Energy Project is in Riverside County, California, at 33.6650, −114.9981. It is in the California Independent System Operator balancing area (CISO).

Who operates Genesis Solar Energy Project?

EIA-860M for August 2026 lists Genesis Solar LLC as the operator (EIA operator ID 56723). The operator is not always the owner.

When did Genesis Solar Energy Project start operating?

Its first generator began operating in November 2013, according to EIA-860M.

Does InfraMap have power prices for Genesis Solar Energy Project?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Genesis Solar Energy Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page