SolarBattery storageOperatingAZPS

Cotton Center Solar Hybrid

Solar and battery storage project in Maricopa County, Arizona. 34 MW of nameplate capacity across 2 generators, operated by Arizona Public Service Co.

Also known as EIA plant 57561

This project groups Cotton Center Solar Hybrid (EIA 57561). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

RE Gillespie 1 LLCPaloma Solar HybridGila River Power Block 4Cotton Center Solar Hybrid2 km
Open in the map
6 plants within 7.3 km, from EIA coordinates.

Key facts

Capacity
34 MWSolar 17.0 · Battery storage 17.0
Generators
2 operatingEIA-860M, August 2026
Operating since
November 2011First generator online
Operator
Arizona Public Service CoEIA operator ID 803
Grid
AZPSBalancing authority AZPS
Price nodes
None linkedNo verified ISO node
Location
Maricopa County, AZ33.0347, −112.6617
EIA plant ID
57561EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cotton Center Solar Hybrid produces

Free · EIA-923

Net generation, 2025

29.4 GWh

29,432 MWh, final

Capacity factor, 2025

21.8%

2024: 26.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

29.4–42.8

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
201111,55238.5%12 of 12
201246,17230.9%12 of 12
201343,65829.3%12 of 12
201443,64829.3%12 of 12
201542,79828.7%12 of 12
201638,99326.1%12 of 12
201732,59421.9%12 of 12
201836,79224.7%12 of 12
201939,07526.2%12 of 12
202039,08126.2%12 of 12
202140,86527.4%12 of 12
202234,81423.4%12 of 12
202332,712Not reported9 of 12
202436,49226.4%12 of 12
202529,43221.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CC17MBatteries17.0April 2023
PV1Solar Photovoltaic17.0November 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arizona Public Service Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cotton Center Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cotton Center Solar Hybrid

More plants operated by Arizona Public Service Co

Questions about Cotton Center Solar Hybrid

How much power does Cotton Center Solar Hybrid produce?

Cotton Center Solar Hybrid reported 29,432 MWh (29.4 GWh) of net generation in 2025, a 21.8% capacity factor on 34 MW of nameplate capacity.

Where is Cotton Center Solar Hybrid?

Cotton Center Solar Hybrid is in Maricopa County, Arizona, at 33.0347, −112.6617. It is in the Arizona Public Service Company balancing area (AZPS).

Who operates Cotton Center Solar Hybrid?

EIA-860M for August 2026 lists Arizona Public Service Co as the operator (EIA operator ID 803). The operator is not always the owner.

Is Cotton Center Solar Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 17 MW and battery storage capacity totals 17 MW.

When did Cotton Center Solar Hybrid start operating?

Its first generator began operating in November 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page