Battery storageOperatingNA

Battery Energy Storage System

Battery storage project in Fairbanks North Star, Alaska. 40 MW of nameplate capacity across 1 generator, operated by Golden Valley Elec Assn Inc.

Also known as GVEA Battery Energy Storage System · EIA plant 57583

Analyst: free account, 1 question a day.

FWA Central Heat and Power PlantFairbanksUniversity of Alaska…North PoleBattery Energy Storag…10 km
Open in the map
5 plants within 20 km, from EIA coordinates.

Key facts

Capacity
40 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2003First generator online
Operator
Golden Valley Elec Assn IncEIA operator ID 7353
Grid
NABalancing authority NA
Price nodes
None linkedNo verified ISO node
Location
Fairbanks North Star, AK64.8167, −147.7250
EIA plant ID
57583EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Battery Energy Storage System produces

Free · EIA-923

Net generation, 2025

−3.67 GWh

−3,666 MWh, final

Battery discharge, 2025

239 MWh

Charge 3.91 GWh

January to July 2026

−4.43 GWh

Provisional

Range, 2016 to 2025

−3.7–−2.4

GWh a year. Low 2025, high 2016

Annual net generation, GWh
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016−2,392Not reported12 of 12
2017−2,711Not reported12 of 12
2018−2,428Not reported12 of 12
2019−3,280Not reported12 of 12
2020−2,810Not reported12 of 12
2021−3,433Not reported12 of 12
2022−2,529Not reported12 of 12
2023−2,443Not reported12 of 12
2024−2,972Not reported12 of 12
2025−3,666Not reported12 of 12
2026 (provisional, partial year)−4,432Not reported7 of 7

* 2026 covers January to July and is provisional. Battery plants can report negative net generation, when charging uses more energy than they discharge.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BESSBatteries40.0December 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Golden Valley Elec Assn Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Battery Energy Storage System and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Battery Energy Storage System

More plants operated by Golden Valley Elec Assn Inc

Questions about Battery Energy Storage System

How much power does Battery Energy Storage System produce?

Battery Energy Storage System reported −3,666 MWh (−3.67 GWh) of net generation in 2025. From January to July 2026 it reported −4.43 GWh, which is provisional.

Where is Battery Energy Storage System?

Battery Energy Storage System is in Fairbanks North Star, Alaska, at 64.8167, −147.7250. It is in the No BA balancing area (NA).

Who operates Battery Energy Storage System?

EIA-860M for August 2026 lists Golden Valley Elec Assn Inc as the operator (EIA operator ID 7353). The operator is not always the owner.

When did Battery Energy Storage System start operating?

Its first generator began operating in December 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page