Natural gasOperatingCAISO

Signal Hill West Unit

Natural gas power plant in Los Angeles County, California. 5.7 MW of nameplate capacity across 1 generator, operated by Signal Hill Petroleum, Inc.

Also known as EIA plant 57702

Analyst: free account, 1 question a day.

City of Long Beach Ai…Cathode (Hinson) BESSLong Beach Convention CenterSouth Bay Dis Ctr 20-SLLAX512Signal Hill West Unit2 km
Open in the map
6 plants within 5.9 km, from EIA coordinates.

Key facts

Capacity
5.7 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2004First generator online
Operator
Signal Hill Petroleum, IncEIA operator ID 57027
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA33.8112, −118.1756
EIA plant ID
57702EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Signal Hill West Unit produces

Free · EIA-923

Net generation, 2025

38.9 GWh

38,905 MWh, final

Capacity factor, 2025

77.9%

2024: 73.6%

January to July 2026

23.7 GWh

Provisional

Range, 2015 to 2025

35.2–41.5

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
201139,49879.1%12 of 12
201239,11678.1%12 of 12
201341,72283.6%12 of 12
201438,30076.7%12 of 12
201541,54683.2%12 of 12
201635,89471.7%12 of 12
201738,97978.1%12 of 12
201839,25878.6%12 of 12
201938,03276.2%12 of 12
202041,49182.9%12 of 12
202139,70279.5%12 of 12
202237,45775.0%12 of 12
202335,18770.5%12 of 12
202436,85073.6%12 of 12
202538,90577.9%12 of 12
2026 (provisional, partial year)23,68181.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Other Gases5.7July 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Signal Hill Petroleum, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Signal Hill West Unit and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Signal Hill West Unit

Questions about Signal Hill West Unit

How much power does Signal Hill West Unit produce?

Signal Hill West Unit reported 38,905 MWh (38.9 GWh) of net generation in 2025, a 77.9% capacity factor on 5.7 MW of nameplate capacity. From January to July 2026 it reported 23.7 GWh, which is provisional.

Where is Signal Hill West Unit?

Signal Hill West Unit is in Los Angeles County, California, at 33.8112, −118.1756. It is in the California Independent System Operator balancing area (CISO).

Who operates Signal Hill West Unit?

EIA-860M for August 2026 lists Signal Hill Petroleum, Inc as the operator (EIA operator ID 57027). The operator is not always the owner.

When did Signal Hill West Unit start operating?

Its first generator began operating in July 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page