SolarOperatingLDWP

City of Long Beach Airport Lot A & B

Solar power plant in Los Angeles County, California. 1.8 MW of nameplate capacity across 1 generator, operated by Solar DG CA Long Beach, LLC.

Also known as EIA plant 67994

Analyst: free account, 1 question a day.

CSU Long Beach Lots 7 & 14CSU Long BeachAES ES Alamitos 2 LLCAES Alamitos LLCCity of Long Beach Ai…2 km
Open in the map
6 plants within 6.4 km, from EIA coordinates.

Key facts

Capacity
1.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
February 2024First generator online
Operator
Solar DG CA Long Beach, LLCEIA operator ID 66541
Grid
LDWPBalancing authority LDWP
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA33.8152, −118.1412
EIA plant ID
67994EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power City of Long Beach Airport Lot A & B produces

Free · EIA-923

Net generation, 2025

3.43 GWh

3,426 MWh, final

Capacity factor, 2025

21.7%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2024 to 2025

2.8–3.4

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
20242,835Not reported12 of 12
20253,42621.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
COLBASolar Photovoltaic1.8February 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Solar DG CA Long Beach, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query City of Long Beach Airport Lot A & B and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near City of Long Beach Airport Lot A & B

Questions about City of Long Beach Airport Lot A & B

How much power does City of Long Beach Airport Lot A & B produce?

City of Long Beach Airport Lot A & B reported 3,426 MWh (3.43 GWh) of net generation in 2025, a 21.7% capacity factor on 1.8 MW of nameplate capacity.

Where is City of Long Beach Airport Lot A & B?

City of Long Beach Airport Lot A & B is in Los Angeles County, California, at 33.8152, −118.1412. It is in the Los Angeles Department of Water and Power balancing area (LDWP).

Who operates City of Long Beach Airport Lot A & B?

EIA-860M for August 2026 lists Solar DG CA Long Beach, LLC as the operator (EIA operator ID 66541). The operator is not always the owner.

When did City of Long Beach Airport Lot A & B start operating?

Its first generator began operating in February 2024, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page